My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-08-13 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
La Porte Development Corporation/4B
>
2013
>
07-08-13 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:49:23 AM
Creation date
3/7/2025 1:42:37 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of • <br />La Porte Development Corporation <br />604 • Parkway <br />LaPorte, <br />C • =4; ! / • <br />My name is ' • • Johnson,owner of R• • JohnsonlocalReal <br />Development company formed in 1985. This is my 40th year in the real estate business, <br />which began in Houston in 1973. <br />For the last 12 years, we have concentrated on "in -fill" locations at major come <br />and ad oining strong retail users. We have developed in Mid -town, Washington Avenu <br />Sugar Land, OST @ Scott, Porter Texas and just completed our third phase at the <br />Shoppes of Town Square on Center Street and Pasadena Blvd in Deer Park (enclosed <br />photo's of Phases <br />We hope to entice some of our Deer Park . <br />Firehouse Subs, Papa Murphy's Pizza, Wing Stop, Sport Clips, and Verizon to join us in <br />. Porte. <br />secondV'e've contracted for a portion of the Jay Marks Chevrolet site at the Southwesi <br />comer of Highway 146 and Spencer Highway as our first phase (approximately 2.86 <br />phase of <br />We hope to begin the project in the fall once we've settled on a site plan and the <br />tenants that make the development possible and successful. That's where we need the <br />financial assistance from the 4B Development Board. For our project to work we have to <br />be able to be competitive on both rents and pricing — we'll be developing a brand new <br />center and competing with the older area property rents (Fairmont Parkway and Highway <br />146). We feel we build a great product for the price, but we've got some additional cost <br />of . • demolition an• lift removal.•• to the purchase price of property n <br />makes the economics of • •,. extremely tight.• .• see attached demolition <br />removal bids from Cherry Demolition and NCM Demolition, two of the most respected — <br />demolition companies in the country- we're in the process of getting lift removal pricing). <br />We believe that if we can make the economics of the development attractive <br />enough to our perspective tenants we can get these tenants and some new faces to follow <br />us to La Porte — we feel this is an extremely underserved market that is perfect for our <br />•- of development. <br />5 Riverway, Suite 340 ® Houston, Texas 77056 a (713) 957-2552 0 Fax: (713) 957-0138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.