My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-13-15 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
La Porte Development Corporation/4B
>
2015
>
04-13-15 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 9:50:56 AM
Creation date
3/7/2025 1:43:29 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/13/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submitted Submitted to the CLP on 3/24/15, and staff completed a plan review 3/25/15. Staff and the to the CLP on 3/24/15, and staff completed a plan review 3/25/15. Staff and the <br /> <br />remodel plansremodel plans <br />contractor are still discussing some plan review items,contractor are still discussing some plan review items, <br />Submitted Submitted to the Harris County Health Department (HCHD), which is required to receive a to the Harris County Health Department (HCHD), which is required to receive a <br />building plansbuilding plans <br />food service permit from the HCHD and, subsequently, a building permit from the City of La Porte,food service permit from the HCHD and, subsequently, a building permit from the City <br /> of La Porte, <br />Have received a Have received a from the TABC, which may be used by the Pipeline Grill or transferred to from the TABC, which may be used by the Pipeline Grill or transferred to <br />liquor licenseliquor license <br />another tenant,another tenant, <br />Discovered that all the grease lines in the floor of the kitchen are clogged beyond repair and will have to be Discovered that all the grease lines in the floor of the kitchen are clogged <br /> beyond repair and will have to be <br />torn out and replaced, torn out and replaced, <br />Discovered that all the metal studs in the kitchen, which were previously planned to be saved and reDiscovered that all the metal studs in the kitchen, which were previously planned <br /> to be saved and re--used, <br />will have to be torn out and replaced,will have to be torn out and replaced, <br />Discovered that the fire suppression system will have to be brought up to code, andDiscovered that the fire suppression system will have to be brought up to code, and <br />Discovered that the restroom facilities will have to be expanded and brought up to the standards outlined in Discovered that the restroom facilities will have to be expanded and brought <br /> up to the standards outlined in <br />the current building code. the current building code. <br />Action Required by the La Porte Development Corporation:Action Required by the La Porte Development Corporation: <br />Consider approval or other action authorizing staff to award an economic development incentive to Gantstein Consider approval or other action authorizing staff to award an economic development <br /> incentive to Gantstein <br />Esquire, LLC for an amount not to exceed $300,000.Esquire, LLC for an amount not to exceed $300,000. <br />Approved for the La Porte Development Corporation AgendaApproved for the La Porte Development Corporation Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.