My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-04-11 Drainage & Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Drainage Committee
>
2011
>
08-04-11 Drainage & Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 3:10:13 PM
Creation date
3/7/2025 1:49:03 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/4/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Committee member Zemanek inquired as to the cost to move water in the direction it is moving. <br />City Engineer Garza commented gravity is the best direction rather than redirecting the flow. <br />Danny Earp, 1827 Lomax School Rd., addressed the Drainage and Flooding Committee suggesting <br />it would be best to use money to resolve the issue rather than for an Engineering Survey. <br />Mike Cobb, 109 Summer Winds Dr., addressed the Drainage and Flooding Committee with <br />concerns of the proposal and the effects on the parking space at Lomax Arena during events. <br />Joe Smith, 10802 North H Street, addressed the Drainage and Flooding Committee with concerns <br />of pipelines and requested water not be redirected the opposite direction, but to use gravity to send <br />it to the Bay. <br />The Drainage and Flooding Committee directed staff to exclude the proposal and to work on other <br />alternatives and come back with another plan regarding Northwest Park Diversion Basin <br />(Redirection of F101-06). <br />Committee member Engelken commented there have been too many studies, and it is now time to <br />resolve the issues. City Engineer Julian Garza responded he is not proposing to do work that has <br />already be done and informed drainage studies have to be performed before Harris County Flood <br />Control District will provide assistance. Committee member Engelken responded he had heard the <br />word study enough. <br />City Engineer Garza was directed to move forward with design and construction but to postpone the <br />Channel Improvements to B112 until the next meeting. <br />4. Set date for next Drainage and Flooding Committee Meeting <br />Chairman Mosteit set the next Drainage and Flooding Committee Meeting on a date prior to the <br />August 8 th City Council Meeting. <br />5. Committee Comments — The Committee did not have additional comments. <br />6. Executive Session — There was no executive session. <br />7. Adjourn <br />There being no further business, Committee member Engelken moved to adjourn the meeting. <br />Alternate member Leonard seconded. Motion Passed. <br />Meeting was adjourned at 6:05 p.m. <br />Respectfully submitted, <br />Patrice Fogarty, City Secretary <br />Passed and approved on this 4 th day of August 2011. <br />Chairman Mike Mosteit <br />Page2of2 <br />July 11, 2011, Drainage and Flooding Committee Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.