Laserfiche WebLink
Committee member Zemanek asked questions as to cost, and the restriction isat the Battleground <br />Estates project at “P” Streetand asked whether the 48 inch pipe would alleviate the current <br />problems.He also inquired as to the cost to move water in the direction it is currently movingin <br />reference to the redirection of F101-06. City Engineer Garza commented gravity is the best <br />direction rather than redirecting the flow.He asked whether the problem was getting water out of <br />the Shady River sub-division or if it was “tidal” influenced. <br />Alternate Member Leonard voiced his concerns with the redirection of water flowfrom F101-06. He <br />said that this may create additional problems to those that currently exist in this areaand could <br />reverse some of the improvements that have already been made.He is also concerned with a <br />possible detention pond placed in the area that is currently used for parking area during eventsat <br />theLomax Rodeo Arena, which would adversely affect the entire city. <br />Danny Earp, 1827 Lomax School Rd., addressed the Drainage and Flooding Committee suggesting <br />it would be best to use money to resolve the issue rather than for an Engineering Survey. <br /> <br />Mike Cobb, 109 Summer Winds Dr., addressed the Drainage andFlooding Committeewith <br />concerns of the proposal and the effects on the parking space at Lomax Arena during events. <br />Joe Smith, 10802 North H Street, addressed the Drainage and Flooding Committee with concerns <br />of pipelines and requested water not be redirected the opposite direction, but to use gravity to send <br />it to the Bay. <br /> <br />The Drainage and Flooding Committee directed staff to exclude the proposal and to work on other <br />alternatives and come back with another plan regarding Northwest Park Diversion Basin <br />(Redirection of F101-06). <br />Committee member Engelken commented there have been too many studies, and it is now time to <br />resolve the issues. City Engineer Julian Garza responded he is not proposing to do work that has <br />already be done and informed drainage studies have to be performed before Harris CountyFlood <br />Control Districtwill provide assistance. Committee member Engelken responded he had heard the <br />word “study” enough. <br />The Drainage and Flooding Committee directed staff to not have any more studies done other than <br />the minimum standards to meet with the standards of Harris County Flood Control. <br />City Engineer Garza was directed to postpone the Channel Improvements to B112project until the <br />next meeting. <br />4. Set date for next Drainage and Flooding Committee Meeting <br />Chairman Mosteit set the next Drainage andFlooding Committee Meeting on a date prior to the <br />th <br />August 8City Council Meeting. <br />5. Committee Comments <br />– The Committee did not have additional comments. <br />6.Executive Session <br /> – There was noexecutive session. <br />Page 2 of 3 <br />July 11, 2011, Amended Drainage and Flooding Committee Minutes <br /> <br />