My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Backup to Item 12B
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
City Council
>
City Council Meetings
>
2009
>
07-27-2009
>
Backup to Item 12B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2024 3:12:45 PM
Creation date
3/7/2025 1:49:57 PM
Metadata
Fields
Template:
La Porte TX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Workshop <br />7/27/09 <br />Excavation & Removal <br />• The City has been approached by several contractors planning to bid on the unclassified <br />fill requirements for the TOOT SH146 project. <br />• The contractors have asked if the City has any excavation projects available (i.e. <br />detention basins) and have indicated their willingness to excavate the sites as a source <br />for the fill. <br />• The City has learned that Harris County Flood Control District (HCFCD) has an <br />"Excavation and Removal" program that addresses similar situations. <br />• Key features of that program are; <br />o Identification of suitable site <br />o Preliminary engineering and environmental work complete <br />o HCFCD enters into agreement with contractor paying the contractor a small fee <br />for the work described in the agreement. <br />o Term of the agreement varies depending on complexity of the work and other <br />factors <br />o Contractor is required to maintain insurance during the term of agreement. <br />o Contractor and all persons entering the site at the contractors request shall <br />execute a Release of Liability. <br />o Contractor is required to conform to all applicable federal, state, and local laws. <br />The HCFCD keeps a list of contractors interested in such work. When a project is <br />determined to be viable, the contractors are contacted (first in -first out basis) to see if <br />they will enter an "Excavation and Removal Agreement." There are no bids taken since <br />the fee for service is below the bidding threshold. <br />The City has a location on F-216 where design is complete and the Army Corp of <br />Engineers (ALOE) permit is pending. Plans were to bid this project when the permit is <br />needed. Consideration of an "Excavation and Removal Agreement' could result in a <br />substantial savings to the City. The estimated cost for excavation of approximately <br />260, 000 cubic yards of material is 2,000,000 million dollars. <br />
The URL can be used to link to this page
Your browser does not support the video tag.