City Council Workshop <br />7/27/09 <br />Excavation & Removal <br />• The City has been approached by several contractors planning to bid on the unclassified <br />fill requirements for the TOOT SH146 project. <br />• The contractors have asked if the City has any excavation projects available (i.e. <br />detention basins) and have indicated their willingness to excavate the sites as a source <br />for the fill. <br />• The City has learned that Harris County Flood Control District (HCFCD) has an <br />"Excavation and Removal" program that addresses similar situations. <br />• Key features of that program are; <br />o Identification of suitable site <br />o Preliminary engineering and environmental work complete <br />o HCFCD enters into agreement with contractor paying the contractor a small fee <br />for the work described in the agreement. <br />o Term of the agreement varies depending on complexity of the work and other <br />factors <br />o Contractor is required to maintain insurance during the term of agreement. <br />o Contractor and all persons entering the site at the contractors request shall <br />execute a Release of Liability. <br />o Contractor is required to conform to all applicable federal, state, and local laws. <br />The HCFCD keeps a list of contractors interested in such work. When a project is <br />determined to be viable, the contractors are contacted (first in -first out basis) to see if <br />they will enter an "Excavation and Removal Agreement." There are no bids taken since <br />the fee for service is below the bidding threshold. <br />The City has a location on F-216 where design is complete and the Army Corp of <br />Engineers (ALOE) permit is pending. Plans were to bid this project when the permit is <br />needed. Consideration of an "Excavation and Removal Agreement' could result in a <br />substantial savings to the City. The estimated cost for excavation of approximately <br />260, 000 cubic yards of material is 2,000,000 million dollars. <br />