My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-25-11 Regular Meeting of the La Porte City Council
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
City Council
>
City Council Meetings
>
2011
>
04-25-11 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2015 5:10:39 PM
Creation date
3/7/2025 1:50:36 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/25/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> Appropriation <br /> Agenda Date Requested: April 25, 2011 <br /> Source of Funds: GEN 957 <br /> Requested By: Julian Garza <br /> Account Number: GEN 957- 050- 9892 - 957 -1100 <br /> Department: Planning <br /> Amount Budgeted: $700,000.00 <br /> Report: X Resolution: _ Ordinance: _ <br /> Amount Requested: $312,988.11 <br /> Exhibit: Unit Bid Tabulation Budgeted Item: X YES _NO <br /> Exhibit: Consulting Engineer Recommendation <br /> SUMMARY <br /> Advertized, sealed bid number 11020 — Brookglen Detention Ponds bids were opened and read on April <br /> 5, 2011. The City received bids from seven vendors. The low bid meeting specifications was submitted <br /> by Paskey, Inc. in the amount of $298,083.91. The project consists of construction of two detention <br /> ponds totaling approximately 25,000 cubic yards with concrete pilot channels, drainage improvements <br /> including new manholes, connections, and installation of approximately 800 linear feet of 24- inch <br /> reinforced concrete storm sewer pipe and surface restoration. The work includes driveway and sidewalk <br /> replacement, new outfalls into Ditch Channel Unit No. B112-00-00 and B112-02-00 and other related <br /> improvements and restoration. The Project is located in the Brookglen Subdivision on Somerton Dr. and <br /> Bandridge Dr. <br /> Staff recommends award of contract in the amount of $298,083.91 to the low bidder, Paskey, Inc. Staff <br /> also recommends authorizing a 5% contingency equal to $14,904.20 for a total authorized amount <br /> requested of $312,988.11. <br /> Action Required by Council: <br /> Authorize the City Manager to enter into contract with Paskey, Inc. in the amount of $298,083.91 and <br /> further authorizing a 5% contingency of $14,904.20• for a total amount of $312,988.11 for construction of <br /> two detention ponds in Brookglen Subdivision. <br /> A l s r i■Q.r or C't ouncil A. enda <br /> 7FA q 41,4 <br /> Ron Bottoms, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.