My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-12 Regular Meeting of La Porte City Council
LaPorte
>
Agenda packets
>
City Council
>
2012
>
07-09-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2012 9:28:42 AM
Creation date
3/7/2025 1:54:01 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Budget <br />Agenda Date Requested:July 9, 2012 <br />Source of Funds:Fund 015 <br />Requested By:Tim Tietjens <br /> 015-9892-709-1100 <br />Account Number:015-9892-627-1100 <br />Department:Planning <br />Amount Budgeted:$124,611 <br />Report: XResolution:Ordinance: <br />Amount Requested:$99,178 <br />Exhibits:Bidder’s List <br />Budgeted Item:YES_X_NO___ <br />Exhibits: Bid Tabulation <br />ExhibitsReplacement/Infill Locations <br />SUMMARY & RECOMMENDATION <br />This year,the two sidewalk programs were merged into a single project for bidding purposes. The scope of this <br />project encompassesapproximately 3,400 LFof sidewalk replacement, 800LFof sidewalk infill and the <br />constructionof 16 wheelchair ramps. <br />Out of the 19 firms that picked up bid packages, the City received 10 bid proposals.Bids were opened on June 19 <br />with the low bid beingsubmitted by South Ranger Construction in the amountof $90,177.16. Staff, being <br />unfamiliar with the firm,interviewed their referencesand foundSouth Ranger Construction qualifications <br />acceptable. <br />Staff’s recommendation is to enter into contract to construct the 2012 City Wide Sidewalk Replacement and Infill <br />Project with South Ranger Construction in the amount of $90,177.16 and establish a construction contingency <br />account in the amount of $9,000. In the past,the construction contingency has been used to address additional <br />citizen generated sidewalk concerns thatarisewhen citizens seesidewalk reconstructionactivities. <br />Project Benefits, Liabilities, and Operating Costs <br />The Sidewalk Replacement Program was initiatedin 1994 to address pedestrian hazardson approximately 100 miles <br />of City sidewalks. Over the years this project has become very popular with La Portians. In general, citizen <br />participationaccounts for the identification of 50% of the areas qualifying for replacement. <br />The Sidewalk Infill Program came into existence in 2007 to provide a safe pedestrian neighborhood connectionto <br />schools, City facilities,andin-fill the voids within neighborhoods. <br />Typically,new sidewalks have no impact on operating costs. Sidewalks have a life expectancy of 7-25 years <br />pending evolution of the topography, therefore these same sidewalks may need to be replaced in the future. <br />Action Required by Council: <br />Consider authorizing the City Manager to enter into a construction contract with South Ranger Construction in the <br />amount of $90,177.16 and establish a construction contingency in the amount of $9,000. <br />Approved for City Council Agenda <br />Corby D. Alexander,City ManagerDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.