Sole Bidder
<br />Reytec Construction Resources, Inc.
<br />Item
<br />Descri tion
<br />Unit
<br />QuantityUNIT
<br />TOTAL
<br />LIFT
<br />Item
<br />STATION AND FORCE MAIN BID TEMS (TWDB)
<br />PRICE
<br />AMOUNT
<br />1
<br />Pro osed Lift Station
<br />1a
<br />MCC Building, complete in place, the sum of:
<br />LS
<br />1
<br />$ 350 000.00
<br />$ 350 000.00
<br />Installation of 14' diameter wet well by caisson construction (precast or cast -in -place),
<br />including stainless steel guide rails, triplex analog control panel with float backup in stainless
<br />steel enclosure, three (3) aluminum access hatches, safety netting, lift station piping &
<br />11,
<br />valves as shown in mechanical plan and section drawings, combination air release
<br />LS
<br />1
<br />$ 2,500,000.00
<br />$ 2,500,000.00
<br />valve/vaccuum valve on header piping, piping supports and thrust blocking, air vent piping,
<br />site work including, fencing, fence gates, concrete pad for heading piping, and all work as
<br />shown on Plans and described in Specifications, complete in place, the sum of:
<br />1c
<br />Flygt 85 hp Pumps, complete in place, the sum of:
<br />EA
<br />3
<br />$ 150,000.00
<br />$ 450,000.00
<br />1d
<br />Site Concrete including 6-inch concrete curb including ground leveling, reinforcement, joints,
<br />SY
<br />300
<br />$ 500.00
<br />$ 150,000.00
<br />joint sealant, excavation, curing, complete in place, the sum of:
<br />Electrical System Installation: Provide and install all work shown on Plans and described in
<br />Specifications including as follows: Provide and install motor control center, odor control
<br />2
<br />system, natural gas genterator, automatic transfer switch, lighting and receptacles, pump
<br />LS
<br />1
<br />$ 750,000.00
<br />$ 750,000.00
<br />motor feeders and terminal boxes, electrical service equipment, autosensory controls,
<br />telephone service, and all required appurtenances as shown on Plans and as described in
<br />Specifications for a complete operating system, complete in place, the sum of:
<br />3
<br />Lift Station Controller Programming: Allowance for lift station controller programming per
<br />LS
<br />1
<br />$ 22,500.00
<br />$ 22,500.00
<br />Specification Section 16904- "Controller", complete in place, the sum of:
<br />Lift Station Electric Service: Allowance for electric service by the local Electric Service
<br />4
<br />Provider. Exact amount to be reimbursed to the Contractor upon submittal of invoice from
<br />LS
<br />1
<br />$ 20,000.00
<br />$ 20,000.00
<br />the Electric Service Provider, complete in place, the sum of:
<br />Lift Station Telephone Service: Allowance for telephone service by the local Telephone
<br />5
<br />Service Provider. Exact amount to be reimbursed to the Contractor upon submittal of
<br />LS
<br />1
<br />$ 2,000.00
<br />$ 2,000.00
<br />invoice from the Telephone Service Provider, complete in place, the sum of:
<br />Lift Station Natural Gas Service: Allowance for natural gas service by the local Natural Gas
<br />6
<br />Service Provider. Exact amount to be reimbursed to the Contractor upon submittal of
<br />LS
<br />1
<br />$ 5,000.00
<br />$ 5,000.00
<br />invoice from the Natural Gas Service Provider, complete in place, the sum of:
<br />7
<br />Deep well pointing for proposed lift station, complete in place, the sum of:
<br />EA
<br />1
<br />$ 100,000.00
<br />$ 100,000.00
<br />Proposed 1-inch long side water service connection to lift station site, including service tap,
<br />8
<br />1-inch meter, reduced pressure backfiow preventer, and hose bib as per details, complete in
<br />LS
<br />1
<br />$ 15,000.00
<br />$ 15,000.00
<br />place, the sum of:
<br />9
<br />Demolish existing lift station including salvage of existing equipment and demolition of the
<br />EA
<br />6
<br />$ 100,000.00
<br />$ 600,000.00
<br />existing structure per details, complete in place, the sum of:
<br />Abandon existing lift station and convert wet well to sanitary sewer manhole, including
<br />10
<br />salvage of existing equipment, filling lift station bottom with grout to lowest invert level,
<br />EA
<br />3
<br />$ 100,000.00
<br />$ 300,000.00
<br />connecting new sanitary sewer lateral into manhole, and precast concrete transition slab with
<br />new manhole lid, ring, cover, and cone section, complete in place, the sum of:
<br />11
<br />Remove existing sanitary sewer force main, all sizes and depths, complete in place, the sum
<br />LF
<br />3,100
<br />$ 10.00
<br />$ 31,000.00
<br />of:
<br />12
<br />Cut, plug, and abandon existing sanitary sewer force main, complete in place, the sum of:
<br />EA
<br />13
<br />$ 250.00
<br />$ 3,250.00
<br />13
<br />12" C900 PVC san swr force main (Auger), complete in place, the sum of:
<br />LF
<br />8,100
<br />$ 200.00
<br />$ 1,620,000.00
<br />14
<br />C900 PVC san swr force main w/ 20" steel casing (Auger), complete in place, the sum
<br />LF
<br />200
<br />$ 1,000.00
<br />$ 200,000.00
<br />of:
<br />15
<br />Connect 12" C900 PVC san swr force main to existing manhole, complete in place, the sum
<br />EA
<br />1
<br />$ 30,000.00
<br />$ 30,000.00
<br />of:
<br />16
<br />Air Release Valve Manhole, complete in place, the sum of:
<br />EA
<br />10
<br />$ 15,000.00
<br />$ 150,000.00
<br />17
<br />6" C900 PVC san swr force main (Auger), complete in place, the sum of:
<br />LF
<br />530
<br />$ 150.00
<br />$ 79,500.00
<br />18
<br />8" C900 PVC san swr force main (Auger), complete in place, the sum of:
<br />LF
<br />1,350
<br />$ 170.00
<br />$ 229,500.00
<br />19
<br />Remove and replace 4" thick reinforced concrete sidewalk/walkway, all widths, with compact
<br />SF
<br />300
<br />$ 25.00
<br />$ 7,500.00
<br />subgrade, complete in place, the sum of:
<br />20
<br />Remove and dispose wooden pedestrian bridge, complete in place, the sum of:
<br />EA
<br />1
<br />$ 3,000.00
<br />$ 3,000.00
<br />21
<br />Remove and replace chain link fence, complete in place, the sum of:
<br />LF
<br />30
<br />$ 100.00
<br />$ 3,000.00
<br />22
<br />Remove and replace existing sidewalk curb ramp in conformance with ADA standards,
<br />EA
<br />1
<br />$ 5,000.00
<br />$ 5,000.00
<br />complete in place, the sum of:
<br />23
<br />Connect proposed 12-inch sanitary sewer force main to proposed &inch force main from Lift
<br />EA
<br />1
<br />$ 2,500.00
<br />$ 2,500.00
<br />Station 10, complete in place, the sum of:
<br />24
<br />Connect proposed sanitary sewer force main to existing force main at Lift Station 26,
<br />EA
<br />1
<br />$ 2,500.00
<br />$ 2,500.00
<br />complete in place, the sum of:
<br />TOTAL LIFT STATION AND FORCE MAIN BID ITEMS (TWDB)
<br />$ 7,631,250.00
<br />SANITARY SEWER ITEMS
<br />25
<br />Remove existing sanitary sewer gravity main, all sizes and depths, complete in place, the
<br />LF
<br />20,000
<br />$ 12.00
<br />$ 240,000.00
<br />sum of:
<br />26
<br />Remove existing sanitary manhole, complete in place, the sum of:
<br />EA
<br />67
<br />$ 1,500.00
<br />$ 100,500.00
<br />27
<br />12" PVC sanitary sewer pipe ASTM D3034 SDR26, all depths (Open Cut), complete in
<br />LF
<br />3,550
<br />$ 280.00
<br />$ 994,000.00
<br />place, the sum of:
<br />28
<br />12" PVC sanitary sewer pipe ASTM D3034 SDR26 w/20" Steel Casing, all depths (Auger),
<br />LF
<br />350
<br />$ 1,200.00
<br />$ 420,000.00
<br />complete in place, the sum of:
<br />29
<br />15" PVC sanitary sewer pipe ASTM D3034 SDR26, all depths (Open Cut), complete in
<br />LF
<br />3,120
<br />$ 400.00
<br />$ 1,248,000.00
<br />place, the sum of:
<br />30
<br />18 PVC sanitary sewer pipe ASTM F679 PS115, all depths (Open Cut), complete in place,
<br />LF
<br />8,100
<br />$ 420.00
<br />$ 3,402,000.00
<br />the sum of:
<br />31
<br />18" PVC sanitary sewer pipe ASTM F679 PS115 w/30" Steel Casing, all depths (Auger),
<br />LF
<br />640
<br />$ 1,500.00
<br />$ 960,000.00
<br />complete in place, the sum of:
<br />32
<br />21" PVC sanitary sewer pipe ASTM F679 PS115, all depths (Open Cut), complete in place,
<br />LF
<br />5,200
<br />$ 500.00
<br />$ 2,600,000.00
<br />the sum of:
<br />33
<br />36" Fiberglass Reinforced Pipe, all depths (Open Cut), all depths, complete in place, the
<br />LF
<br />3,000
<br />$ 600.00
<br />$ 1,800,000.00
<br />sum of:
<br />34
<br />36" steel casing on 21" PVC sanitary sewer pipe, all depths, complete in place, the sum of:
<br />LF
<br />100
<br />$ 1,200.00
<br />$ 120,000.00
<br />35
<br />48" steel casing on 36" Fiberglass Reinforced Pipe, all depths, complete in place, the sum
<br />LF
<br />50
<br />$ 1,500.00
<br />$ 75,000.00
<br />of:
<br />36
<br />Trench safety, all depths, complete in place, the sum of:
<br />LF
<br />23,000
<br />$ 5.00
<br />$ 115,000.00
<br />37
<br />Short side sanitary sewer service reconnection, all depths, complete in place, the sum of:
<br />EA
<br />115
<br />$ 2,500.00
<br />$ 287,500.00
<br />38
<br />Long side sanitary sewer service reconnection, all depths, complete in place, the sum of:
<br />EA
<br />75
<br />$ 5,000.00
<br />$ 375,000.00
<br />39
<br />Cut, plug, & abandon existing sanitary sewer gravity pipe, all sizes, all depths, complete in
<br />EA
<br />12
<br />$ 2,000.00
<br />$ 24,000.00
<br />place, the sum of:
<br />40
<br />Rehabilitate manhole/wet well with cementitious liner (SewperCoat PG or approved equal),
<br />SF
<br />2,800
<br />$ 40.00
<br />$ 112,000.00
<br />all sizes, all depths, complete in place, the sum of:
<br />41
<br />4' diameter sanitary sewer manhole, including bedding and backfill, complete in place, the
<br />EA
<br />70
<br />$ 2,000.00
<br />$ 140,000.00
<br />sum of:
<br />42
<br />Extra depth for manhole drop connections greater than 8', complete in place, the sum of:
<br />VF
<br />200
<br />$ 750.00
<br />$ 150,000.00
<br />43
<br />5' diameter sanitary sewer manhole, including bedding and backfill, complete in place, the
<br />EA
<br />9
<br />$ 30,000.00
<br />$ 270,000.00
<br />sum of: