Sole Bidder
<br />Reytec Construction Resources, Inc.
<br />Item Descri tion Unit QuantityUNIT
<br />TOTAL
<br />Item
<br />LIFT STATION AND FORCE MAIN BID TEMS TWDB
<br />PRICE
<br />AMOUNT
<br />COUPLAND DRIVE PAVING BID ITEMS:
<br />96
<br />6" thick reinforced concrete driveway, complete in place the sum of:
<br />SY
<br />1,250
<br />$ 130.00
<br />$ 162,500.00
<br />97
<br />Temporary driveways, complete in place the sum of:
<br />EA
<br />32
<br />$ 850.00
<br />$ 27,200.00
<br />98
<br />Temporary pavement (black base), complete in place the sum of:
<br />SY
<br />800
<br />$ 65.00
<br />$ 52,000.00
<br />99
<br />Remove and dispose of existing concrete pavement and base material, complete in place
<br />the sum of:
<br />SY
<br />5,000
<br />$ 10.00
<br />$ 50,000.00
<br />100
<br />Remove and replace 4" thick reinforced concrete walkway, complete in place the sum of:
<br />SF
<br />60
<br />$ 50.00
<br />$ 3,000.00
<br />101
<br />Remove and replace 6-inch concrete curb, complete in place the sum of:
<br />LF
<br />3,100
<br />$ 10.00
<br />$ 31,000.00
<br />102
<br />7.5" reinforced concrete pavement, complete in place the sum of:
<br />SY
<br />5,000
<br />$ 100.00
<br />$ 500,000.00
<br />103
<br />6" lime stabilized subgrade, complete in place the sum of:
<br />SY
<br />5,760
<br />$ 15.00
<br />$ 86,400.00
<br />104
<br />Lime for stabilized subgrade (8 % by dry unit weight), complete in place, the sum of:
<br />TN
<br />105
<br />$ 300.00
<br />$ 31,500.00
<br />105
<br />Remove, store, and reset existing traffic sign, complete in place the sum of:
<br />EA
<br />2
<br />$ 5.00
<br />$ 10.00
<br />106
<br />Traffic Control, complete in place the sum of:
<br />LS
<br />1
<br />$ 50,000.00
<br />$ 50,000.00
<br />107
<br />SWPPP, complete in place the sum of:
<br />LS
<br />1
<br />$ 50,000.00
<br />$ 50,000.00
<br />TOTAL COUPLAND DRIVE PAVING ITEMS
<br />$ 1,043,610.00
<br />COUPLAND DRIVE SUPPLEMENTAL BID ITEMS:
<br />108
<br />Remove and reset existing mailboxes, complete in place the sum of:
<br />EA
<br />30
<br />$ 500.00
<br />$ 15,000.00
<br />109
<br />Extra cement stabilized sand, complete in place, the sum of:
<br />CY
<br />30
<br />$ 60.00
<br />$ 1,800.00
<br />110
<br />Adjust existing valve box, meter box, or cleanout to be flush with top of proposed pavement
<br />or finished grade, complete in place the sum of:
<br />EA
<br />4
<br />$ 250.00
<br />$ 1,000.00
<br />111
<br />Long side water line service reconnection, complete in place the sum of:
<br />EA
<br />19
<br />$ 1,100.00
<br />$ 20,900.00
<br />112
<br />Long side sewer line service reconnection, complete in place the sum of:
<br />EA
<br />12
<br />$ 3,500.00
<br />$ 42,000.00
<br />113
<br />Additional footage for water service, complete in place the sum of:
<br />LF
<br />50
<br />$ 150.00
<br />$ 7,500.00
<br />114
<br />Additional footage for sewer service, complete in place the sum of:
<br />LF
<br />50
<br />$ 150.00
<br />$ 7,500.00
<br />115
<br />Installation and removal of piezometers, complete in place, the sum of:
<br />EA
<br />3
<br />$ 2,000.00
<br />$ 6,000.00
<br />116
<br />Bank Sand, complete in place, the sum of:
<br />CY
<br />30
<br />$ 25.00
<br />$ 750.00
<br />117
<br />Well pointing for proposed storm sewer, all depths, including all appurtenances, complete in
<br />place, the sum of:
<br />LF
<br />150
<br />$ 1.00
<br />$ 150.00
<br />118
<br />Wet Condition Bedding for storm sewer installation, all Sizes, all Depths, consisting of
<br />Limestone or recycled concrete foundation, filter fabrics and all appurtenances, complete in
<br />place, the sum of:
<br />LF
<br />150
<br />$ 1.00
<br />$ 150.00
<br />119
<br />Relocate street light pole as per utility company's requirements, complete in place the sum
<br />of:
<br />EA
<br />12
<br />$ 7,500.00
<br />$ 90,000.00
<br />TOTAL COUPLAND DRIVE SUPPLEMENTAL ITEMS
<br />$ 192,75M
<br />ADD ALTERNATIVE
<br />NO. 1 ITEMS:
<br />120
<br />12'. fusible PVC DR18 DIPS san swr force main by trenchless constuction, complete in
<br />place, the sum of:
<br />LF
<br />8100
<br />$ 315.00
<br />$ 2,551,500.00
<br />ADD ALTERNATIVE NO. 1 ITEM TOTAL
<br />$ 2,551,500.00
<br />ADD ALTERNATIVE
<br />NO. 2ITEMS:
<br />121
<br />12'. fusible HDPE DR13.5 DIPS san swr force main by trenchless constuction, complete in
<br />place, the sum of:
<br />LF
<br />8100
<br />$ 175.00
<br />$ 1,417,500.00
<br />ADD ALTERNATIVE NO. 2 ITEM TOTAL
<br />$ 1417500.00
<br />Lift Station and Force Main Items Total:
<br />Sanitary Items Total:
<br />Tree Protection Items Total:
<br />Supplemental Items Total:
<br />Coupland Drive Storm Sewer Items Total:
<br />Coupland Drive Paving Items Total:
<br />Coupland Drive Supplemental Items Total:
<br />Add Alternative No. 1 Items Total:
<br />Add Alternative No. 2Items Total:
<br />TOTAL BID ITEMS:
<br />$ 7,631,250.00
<br />$ 17,826,550.00
<br />$ 202,700.00
<br />$ 550,250.00
<br />$ 1,180,500.00
<br />$ 1,043,610.00
<br />$ 192,750.00
<br />$ 2,551,500.00
<br />I $ 1,417,500.00
<br />32 596 610.00
<br />Page 3
<br />
|