My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1-9-23
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
City Council
>
City Council Meetings
>
2023
>
1-9-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 7:35:06 AM
Creation date
3/7/2025 2:18:40 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
1/9/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"-_ity of La Porte <br />Gecdon00410 <br />Bid Form <br />DATE: 11/29/2022 <br />Bid of Reytec Construction Resources, Inc. anindividual proprietorship, acorporation organized and existing <br />under laws of the State ofTex� Texas, for the Lomax <br />Lift Station Consolidation Project for the City ofLoPorte, Harris County, Texas. <br />The undersigned bidder has carefully examined the Instructions to Bidders, this Prnpona|, the General <br />Conditions of Agreement, the Technical Specifications and the drawings for the work herein above <br />described and referred to in the Invitation to Bid and has carefully examined the site of the work and will <br />provide all necessary labor, ouperintundenoe, maohinery, equipment, tools, materials, services and other <br />means of construction in complete all the work upon which he bido, as oa||od for in the Contract. the <br />Specifications and shown on the drawinga, and in the manner prescribed therein and according tothe <br />requirements nfthe City ofLaPorte. <br />BID-Total:A+B+C+0*E*F*G+H+| <br />Grand Total <br />TOTAL BID $ 11,111,395.00 <br />Written thirty two million three hundred twenty two thousand three hundred ninety five dollars and no cents <br />It is understood and agreed that the work shall be complete in full within 840 calendar days after the date <br />on which work is to be commenced as established by the Contract Documents. <br />|tioagreed that the contract price may beincreased ordecreased hocover work added ordeleted byorder <br />of the Engineer, in accordance with the provisions of the General Conditions of Agreement. <br />The undersigned agrees that the amounts bid in this proposal will not bewithdrawn or modified for sixty <br />(90) days following date of bid opening. <br />It is understood that the bid security accompanying this proposal ahsd| be returned to the undersigned <br />unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction <br />contract and execute bonds aoprovided inthe specifications. |nthe event the undersigned should fail hu <br />enter into a construction contract and execute bonds as required within 14 calendar days after the Engineer <br />has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be <br />forfeited to the Owner and shall be considered as payment for damages due to delay and other <br />inconveniences suffered by the Owner as a result of such failure on the part of the undersigned <br />
The URL can be used to link to this page
Your browser does not support the video tag.