My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6-30-20 Building
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Building Codes Appeals Board
>
2020
>
6-30-20 Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 8:48:16 AM
Creation date
3/7/2025 2:19:00 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Building Codes Appeals Board
Meeting Doc Type
Agenda Packet
Date
6/30/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R402.4.1.2 — Testing (Air Leakage) — Change Summary: Envelope testing is mandatory, no longer <br />an option <br />R403.3.3 — (Duct) Sealing (Mandatory) — Change Summary: (Duct testing required except when <br />ducts and air handler are located within thermal envelope <br />R403.3.4 — Duct Leakage (Prescriptive) — Change Summary: Sets maximum duct leakage at <br />4cfm/100 sq, ft. conditioned area, 3 CFIVI/100 sq. ft. if air handier not installed <br />R403.6 — Mechanical Ventflation (Mandatory) — Change Summary: Requires whole house <br />ventilation be installed <br />C30322 — Multiple layers of continuous insulation — Change Sumrnary: <br />o Where two or more layers of continuous insulation board are used in a construction <br />assembly, the continuous insulation boards shall be installed in accordance with Section <br />C3032 <br />o Where the continuous insulation board manufacturer's instructions do not address <br />installation of two or more layers, the edge joints between each layer of continuous <br />insulation boards shall be staggered. <br />C404.,2 —Service water -heating equipment performance efficiency— Change Summary: Water <br />heater efficiencies. Updated to current federal water heater efficiencies, <br />- C405.2 Lighting controls — Daylighiting controls, Change Summary: Lighting systems shall be <br />provided with controls that comply with Sections C405.2.1 through C4052,6 with exceptions <br />R403.3.6 — Buried Ductwork in Attic — Change Summary:: Where supply and return air ducts are <br />partially or completely buried in ceiling insulation, such ducts shall comply with all of the <br />following: <br />* Supply and return ducts shall have an insulation R-value not less than, R-8, <br />* At all points along each duct, SLIM Of Ceiling insulation R-value against and above the top <br />of duct, and against and below the bottom of duct, shall be not less than R-19, excluding <br />the R-value of the duct insulation <br />* In Climote Zones 1A, 2A and 3A, the supply duicts shall be completely buried within <br />ceiling insulation, insulated to an R-value of not less than R-13 and in compliance with <br />the vapor retarder requirements of Section 604.11 of the International Mechanical Code <br />or Section M1601.4.6, of the International ResidentialCode, as applicable <br />o, Exception: Sections of the supply duct that are less than 3 feet (914 mm) from the <br />Supply Outlet shall not be, required to comply with these requirements. <br />R404.1 — Lighting Equipment (Mandatory). Not less than 90 percent of the permanently installed <br />lighting fixtures shall contain only high -,efficacy lamps. <br />Please Note: The Code Changes Listed Above Do Not Include All Changes to the Code <br />
The URL can be used to link to this page
Your browser does not support the video tag.