Laserfiche WebLink
• <br />• <br />:) Harris County authorized the engineering firm of <br />T.S. Chang (already retained for the Fairmont <br />Parkway project) to prepare a preliminary cost <br />estimate for the overpass. <br />� Special concerns are drainage, pipeline <br />relocations, and the overpass configuration. <br />� Cost expectations are between $5 and $11 <br />million dollars and are heavily dependent on <br />necessary drainage improvements. <br />• <br />