Laserfiche WebLink
0 <br />• <br />� Harris County is also concerned with their <br />consultant's report that the three current <br />roadway projects (Fairmont Parkway, the <br />overpass, and Bay Area Boulevard) along with <br />future Sens Road improvements will require <br />additional detention (estimated 20 acres at $3.5 <br />million)to drain the roadway. <br />� Staff recently learned of this concern and is <br />scheduling meetings with Harris County Flood <br />Control District and Harris County to review the <br />consultant's findings and look for alternatives. <br />9 <br />a <br />