Laserfiche WebLink
� Harris County and La Porte agreed to fund these <br />improvements on a 50/50 basis, with the <br />exception of Luella Boulevard. <br />� La Porte has asked the County to fund the � <br />turning lane at Luella Boulevard. <br />� The City's share was previously estimated to be <br />$2001000. <br />:)A recent preliminary engineering report provided <br />cost estimates for the proposed turning lanes, � <br />which were substantially higher than originally <br />projected. The City's share is now projected to <br />be $400,000. <br />