My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-08-2001 Special Called Workshop Meeting
LaPorte
>
City Secretary
>
Agendas 1000-01
>
City Council
>
2000's
>
2001
>
09-08-2001 Special Called Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 3:28:28 PM
Creation date
3/18/2025 1:27:57 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda
Date
9/8/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ 4 <br />d QJ ~ <br />1 '.'.. ~ ' <br />'_ ~;. <br />LITTLE CEDAR BAYOU WASTEWATER TREATMENT PLANT <br />SOLIDS HANDLING IMPROVEMENTS <br />Changes in design criteria by the Texas Natural Resource Conservation Commission (TNRCC) prompted the <br />City to retain Camp Dresser and McKee (CDM) to perform an evaluation of the sludge processing facilities at <br />the Little Cedar Bayou Wastewater Treatment Plant. CDM concluded that the sludge processing facilities at <br />the Plant are not currently sized to handle the permitted flow of 7.56 million gallons per day (MGD) utilizing <br />the new criteria. Should these facilities not be improved, the permitted flow at the Plant could be reduced by <br />up to 50%. This reduction in capacity would require a plant expansion or perhaps moratorium on future <br />development. <br />The recommended approach was based on alternative evaluations. The recommended sludge handling <br />facilities improvements include: <br />• Modification to Waste Activated Sludge pump station for process control, <br />• Expansion of the existing aerobic digestion process to provide for minimum sludge detention time <br />required by the TNRCC, <br />• Renovation of existing gravity sludge thickener, <br />• Replacement of thickened sludge pumps, and <br />• Construction of a new sludge dewatering/loading building, with the replacement of the existing belt filter <br />press with two (2) new belt filter presses. <br />The proposed cost for these improvements total $3,500,000. These improvements will provide for improved <br />solids handling, ensure continued compliance with existing and upcoming TNRCC regulations and design <br />criteria, and maintain the current 7.56 MGD capacity at the Plant. <br />1 <br />(6) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.