My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-29-2003 Bayport Expansion Review Committee Meeting
LaPorte
>
City Secretary
>
Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2003
>
05-29-2003 Bayport Expansion Review Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 5:23:42 PM
Creation date
3/21/2025 1:18:33 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
5/29/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />State Water Quality Qualifications: This project would result in a direct impact of greater <br />than three acres of waters of the state or 1500 linear feet of streams (or a combination of . <br />the two is above the threshold), and as such would not fulfill Tier I criteria for the project. <br />Therefore, Texas Commission on Environmental Quality (TCEQ) certification is required. <br />Concurrent with U.S. Army Corps of Engineers (Corps) processing of this application, the <br />TCEQ is reviewing this application under Section 401 of the CWA and in accordance with <br />Title 30, Texas Administrative Code Section 279.1-13 to determine if the work would <br />comply with State water quality standards. By virtue of an agreement between the Corps <br />aod the TCEQ, this public notice is also issued for the purpose of advising all known <br />interested persons that t~ere is pending before the TNRCC a decision on water quality <br />certification under such act. Any comments concerning this application may be submitted <br />to the Texas Commission on Environmental Quality, 401 Coordinator, MSC-150, P.O. Box <br />13087, Austin, Texas 78711-3087. The public comment period extends 30 days from the <br />date of publication of this notice. A copy of the public notice with a description of work is <br />made available for review in the TCEQ's Austin office. The complete application may be <br />reviewed in the Corps office. The Texas Commission on :Environmental Quality held a <br />public meeting on April 3, 2003 at the Bay Area Community Center in Seabrook, Texas, <br />on the 401 certification for the proposed project. The comments submitted by the public <br />during the meeting will be considered in evaluating the 401 certification. <br /> <br />National Register of Historic Places: The staff archaeologist has reviewed the latest <br />published version of the National Register of Historic Places, lists of properties determined <br />eligible, and other sources of information. The following is current knowledge of the <br />presence or absence of historic properties and the effects of the undertaking upon these . <br />properties: <br /> <br />The proposed project has been initially reviewed for potential impacts to <br />historic properties. To date, a cultural resources investigation (Prewitt & <br />Associates Report No: 45, January 2000) has been conducted for portions <br />of the proposed project area. The results of the investigation indicate that <br />certain portions of the facility project area contain t]le potential for having <br />,prehistoric and historic sites - with at least three historic sites, 41 HR831-833 <br />having been identified for the project area, and known property 41 HR212 is <br />in the immediate vicinity of the proposed compensatory mitigation area. <br />However, the proposed mitigation site and the latest proposed project <br />boundaries as of May 2003 are not covered in the Prewitt report, and have <br />not been fully investigated for potential impacts to both recorded and <br />potential archaeological sites - and will have to be fully considered in the <br />review process for this project. Additional field surveys are necessary to <br />cover the proposed project boundaries as of May 2003. In addition, our <br />records indicate that the likelihood is not high for the proposed project to <br />encounter significant historic shipwreck sites given the previous dredging and <br /> <br />4 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.