Laserfiche WebLink
Jun. 16 03 12:19p Ci~Taylor Lake Village 28132456 p.5 <br />E. Second 5 Acre Area <br />- 1. Move Sand $2,125,000 <br />2. Wick Drains 106.680 <br />- Sub-Total $2,231,680 <br />20% Contingency _ 446.336 <br />TOTAL - $2,678,016 <br />Assume 3% Increase for each remaining - <br />5 Acre Area. <br />F. Third 5 Acre Area <br />$2,678,016 x 1.03 = $2,758.357 <br />G. Fourth 5 Acre Area <br />- $2,758,375 x 1.03 = $2,841,108 <br />TOTAL EST. COST EQUALS SUM OF <br />• ~ D, E, F AND G 12 209 161 <br />CosVAcre $12.209,161 $610,458 <br />20 <br />A~SPILMlW.71B <br />• <br />