Laserfiche WebLink
• <br />It~NUTES - SPECIAL ~!IESTIlJG <br />I-A PO~tTE CITY COI~.?'~.D:SSION - DECEI.If3ER 1l~,1959 <br />7:00 P, I<i. <br />Special meeting of the City Commission was called to order by P,4ayor H. ~. <br />Pfeiffer, ~riti? the follo~•ing nes.tbers present : Commissioners Lawler, Osbazrn, <br />and I3rorrn, City Secretary 1?aker, and Texas Bayshore Corporation Developers <br />Jones, ?'rri„~'ht, TFock, ?fJhite, and Engineers Byn~ and Broyles. <br />The purpose of this i_tieeting was to discuss the Bay t.4eadows Subdivision, for <br />City approval of Improvement Dravrings, <br />I:fter discussion, the following changes and reco*.~~endations here approved: <br />A . S anit rs~y Sewer : <br />1. Lift Station: <br />a, City approved - v~rants to revietir detail drayrings and specifications <br />when available, <br />b. L~" puisp required. <br />c. Force main: 6" preferred but City ti~rill approve ~." as shcnvn. <br />2, Present so<rrer G all right as 6" as sh~rm rather that chano2 to 8" as <br />previously requested, <br />3. Present b" server on 16th St. from sewer G to C to be changed to °". <br />~.. Developer to obtain .alternate bias for server on 16th St. to determine <br />difference in price bet?veen 8" shcrr~rn north of Sevrer N and a 10". <br />City nay elect to require the installation of a 10" sez^rer all the way <br />on 16th St. far additional future capacity and reimburse the Developer <br />for the additional cost as determined frori the bids. <br />i3. ?'Toter System: <br />1, System as shovrn on drayrings approved. <br />2, Developer must provide service line to each lot. x.4ethod used is left <br />up to the Developer, One :~ethod suggested by the City as satisfactory <br />to the: is the installation of a 1" service line ~ro::1 the grater :gain <br />under the pavenent ~d capped, One such line can serve two lots. <br />City vrill tap this line or install fittings on e nd to install :peters. <br />C. Drainage a rgi Paving: <br />1. Paving approved as shown, <br />2, Re-routing of present ditch draining to south on 16th St, to new <br />location on east side oflLth st. is satisfactory as shaven. <br />3. Ditch from intersection of 16th and North H north to Flood Control <br />Ditch on Dtorth L: <br />The City considered that, due to the depth of this ditch, <br />it 7.vould be objectionable when 16th St. is extended North <br />from. North H to Plorth L and the property in this block <br />developed. The City therefore requires the extension <br />by the Developer of the storm se:-rer from. its proposed <br />terminus at Dtorth H to North L when this section is <br />developed and tre storm surer syste:~ on 16th St, from <br />Crystal Eay Z°Tay north is installed. <br /> <br />