Laserfiche WebLink
a <br />~.. <br /> <br />Motion by Osborn, second by Stabs, that Commissioner Osborn be authorized <br />to par chase meters to meter all char ches acid lodges. <br />Carried. <br />Motion by Stabs, second by Ogburn, that the starting time for West Construct- <br />ion Compan3r be extended 7 days, to April 30, 1962. <br />Carried. <br />Motion by Osborn, second by Stabs, that the following be paid: <br />Phases 1, 2, 3, Architectural-Engineering Final Bill ~b,862.00- <br />5~ - $34j.10, project based on cost of construction. <br />Architectur al-Engineering Inv, #1 for plans and specifications <br />on contract a~~ard Coleman Builders X614,729.00 - 3.25 - ~478.b9. <br />Architectural-Engineering Inv, #2 - Fee for supervision on subject <br />project based on Est. #1 for paxtial payment Couch Construction <br />Co. - X18,107.01 -Fee 1.75% - X316.87. <br />Architectur a1-Engineering Inv, #1 Street Surfacing fee for pre- <br />paration of plans and specifications on subject project based on <br />contract West Construction, Fee Phase 1 & 11, X4,464.00, 3.25%- <br />~145.08. <br />All the above to be paid to Wyatt C, Hedrick, Architect-Engineers. <br />Carried. <br />Motion by Stabs, second by Osburr., that the meeting adjourn. <br />Carried. <br />~.°..; <br />„'~ <br />~~ <br />0~ <br />0~ <br />ATTEST: <br />rank G. Baker, Cl ler' oz City <br />of La Porte, Texas <br />P. Pfeif er of the <br />City of La Po e, s <br />