My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1967-06-19 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1960's
>
1967
>
1967-06-19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:45 PM
Creation date
3/21/2025 1:30:44 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/19/1967
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />5. Commtsstoner Compton made a motion, seconded by Commtsstoner <br />Burgin, and carried, that the following accounts payable be <br />approved: <br />Gulf States Asphalt ~ 609.63 <br />Rtchard E. Broome 343.29 <br />Knox W. Askins 266.90 <br />Motorola Communications 9,035.95 <br />Motorola Communications 2,335.29 <br />+ + + <br />6. Bids for a Float and Cable Flow Recorder were received from <br />the following: <br />Fischer and Porter X598.00 <br />Foxboro 545.00 <br />The Ctty Engineer recommended that the recorder be purchased <br />from Foxboro. <br />Commtsstoner Boyle made a motion, seconded by Commissioner <br />Burgin, that the recorder be purchased from low bidder, <br />Foxboro, for ,545.00 F.O.B. Factory. Motion carried. <br />,~ + + + <br />7. Commtsstoner Burgin requested that the City Clerk prepare <br />and distribute the Commission Meeting minutes, as soon as <br />possible, following a meeting. <br />+ + + <br />8. The following bads for the construction of cabinets at the <br />Lab Building, were received: <br />La Porte Lumber Company <br />Cabinets-Southwest Wall $697.00 <br />-Southeast Wall 398.00 <br />La Porte Construction Company <br />Cabinees-Southwest Wall .690.00 <br />-Southeast V/all 390.00 <br />The City Engineer recommended that the cabinets be authorized, <br />with the Southwest section, ,690.00, coming from the oid budget, <br />and the Southest section, X390.00, coming from the new budget. <br />Corrmisstoner Boyle made a motion, seconded by Commissioner <br />Burgin, that the Zow bidder, La Porte Construction Company, <br />be authorized to construct both sets of cabinets of the same <br />time. Motion carried. <br />+ + + <br />
The URL can be used to link to this page
Your browser does not support the video tag.