Laserfiche WebLink
• • <br />OF <br />a ~ <br />x~ <br />f4 <br />~~_.*•~• <br />• •, <br />• <br />COMMISSION •TAT! NIGNWAY ENGIN[[R <br />CHARLES E. SIMONS, CHAIRMAN TEXAS HIGHWAY DEPARTMENT B. L. DeBERRY <br />DEWITT C. GREER p p <br />HERBERT C. PETRY, JR. f . C~. DOX 1386 <br />Houston, Texas 77001 <br />November 2, 1973 <br />• ~ IN REPLY REFER TO <br />FILE NO. <br />Harris County <br />Loop x+10 and Spur 50l in <br />City of LaPorte <br />Control 389-15 and 389-16 <br />Hon. E. A. Thomas <br />Mayor, City of LaPorte <br />P. 0. Box 1115 <br />LaPorte, Texas 77571 <br />Attention: Mr. Bob Cline, <br />Director of Public Works <br />Dear Sir: <br />Reference is made to recent contacts with this office <br />concerning the drainage along the east ditch of Loop ~l0 and <br />Spur 501 between G Street and Little Cedar Bayou in the City of <br />LaPorte. <br />We have investigated this matter, and the Texas <br />Highway Department agrees to do labor only on the following: <br />1. Install one l8-inch pipe under J Street. <br />2. Install one 2L1--inch pipe under Forest Street and one <br />2~-inch pip e`4 under Garfield Street. <br />3. Cut~'the'trench and place backAfill material at the <br />..three street crossings. <br />~-. ~~eatn ~h~ east ~~tcY~ ~f ~pu~ 5~1 fr~m J Street to the <br />irs rive sou o ar e d tree . <br />The City of LaPorte should agree to the following: <br /> <br />1. Furnish all material and place at the job site. <br /> <br />2. Place the base and surfacing at the three street crossings. <br />