Laserfiche WebLink
BIJSCH, HUTCNISON 8c ASSU~iIN i L5, 11 V V. CONDU1.71/10 /IIOINt/I1~ <br />___. = ~ <br />• 1107 IIttTW000 0111VR ~ OATIOWN, TLXAO 77020 ~- -NONt (711) X22 X2~! <br />June 17, 1974 <br />ESTIMATE NUMDER: Four (4_~ - May 1, 1974 through Present <br />PROJECT: City of La Porte - Water and Sewer Mains, Various Locations - Job too. 73-1029 <br />CONTRAC70R: McKev Construction & Equipment Rentals, Inc. <br />AMOUNT OF CONTRACT: X94,071.00 CONSTRUCTION TIME: 75 4(orkinq Days <br />Item <br />No. Item ua tit Unit Unit Price Total <br />1. 8" Class 150 Asbestos-Cement <br /> Water line, by open trench <br /> construction Com lets in lace 3 680 L.F. 5.00 18,400.00 <br />j 2. 8" Class 150 Asbestos-Cement <br />1 Water Line, by augered construC~. <br /> tion Com lets in lace 457 L:F. 13.50 6,169.50 <br />~ 3. <br />1 6" Class 150 Asbestos-Cement <br /> Water Line, by open trench I <br /> construction Com lets in lace 4 163 L.F. 4.10 17,068.30 <br /> <br />3a. 6" Class 150 Asbestos-Cement Catlett - <br /> Dater Line, by open trench con- 883 6,181.00 <br /> struction with special backfill <br /> on Catlett Lane, Com lets in lace 1,100 L.F.° 7.00 7,700.00 <br />4. 6" Class 150 Asbestos-Cement Catlett - <br />186 <br /> <br />~ <br />Water Line, by augered construc- 2,232.00 <br /> tion Com lets in lace L.F. 12.00 <br />4 <br />5. 2" P.V.C. Water Line, , <br />° Com lets in lace 413 L,F, 3.00 1,239.00 <br />6. 8" x 8" x 6" C.I. Tee, <br /> Com lets in lace 8 Each 85.00 680.00 <br />7. 6" x 6" x 6" C.I. Tee, Catlett - ' <br /> Com lets in lace Each 70.00 70.00 <br />~ 8 • ,. <br />6" x 22-1/2° C.I. Bend. <br />Com lets in lace 1 Each 45.00 s ' 45 0 <br />Continued Page Two <br /> <br /> <br />