Laserfiche WebLink
• <br />BUSCH, HUTCHISON & ASSOCIATES, INC. CONltULTINO[NOtN[[11~ <br />1107 FL[[TWOOD ORIV[ - OAYTOWN, T[7(A• 77520 - FMON[ (71') 422.02171 <br />• <br />DATE: March 7, 1975 <br />ESTIMATE NUMBER: Two (2) - February 1, 1975 through February 28, 1975 ' <br />PROJECT: City of La Porte - Construction of Sanitary Sewers, South Side -Job No. 74-1132 <br />CONTRACTOR:_ McKay Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, Texas <br />AMOUNT OF CONTRACT:_$221,489.42 CONSTRUCTION TIME: 90 Working Days <br /> <br /> <br />tam <br />No. Item uantit Unit Unit Price Total <br />1. 8" V.C. Sanitary Sewer, <br /> R.G. Joints 0 - 6' cut <br /> Com late in lace - 0 - L.F. 5.15 - 0 - <br />2. 8" V.C. Sanltary Sewer, <br /> R.G. Joints 6 - 8' cut <br /> com late in lace - 0 - L.F. 5.47 - 0 - <br />3. 12" V.C. Sanitary Sewer, <br /> R.G. Joints 0 - 6' cut <br /> com fete in lace 300 L.F. 6.26 1,878.00 <br />4. 12" V.C. Sanitary Sewer, <br /> R.G. Joints 6 - 8' cut <br /> Com late in lace 400 L.F. 7.10 2 840.00 <br />5. 12" Y.C. Sanitary Sewer, " <br /> R.G. Joints 8 - 10'' cut <br /> Com late in lace 236 L.F. 9.35 2,206.60 <br />f 6. 12" V.C. Sanitary Sewer, <br />~ R.G. Joints 10 - l2' cut <br /> Com late in lace 545 L.F. 17.58 9,581.10 <br />7. 15" V.C. Sanitary Sewer, <br /> R.G. Joints 8 - 10' cut <br /> Com late in lace 945 L.F. 11.70 11 056.50 <br />8. 21" V.C. Sanitary Sewer, <br /> R. G. Joints 8 - 10' cut <br /> Com late in lace 150 1. g 6 , 2 794.50 <br />9. 21" V.C. Sanitary Sewer, <br /> R.G. Joints 10 - 12' cut <br /> om late in Lace 659 .F. 26.86 17 700.74 <br />f <br />