My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1975-04-07 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1975
>
1975-04-07 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:51 PM
Creation date
3/21/2025 1:32:16 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/7/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ~ ~ • . <br />Page Four -City of La Porte.- South Sidc~ Sanitary Scwc rs, Job No. 74-1132 <br />ate 3 <br />ti <br />-E <br /> ~~1cKey Construction & Equipment .Rentals , Inc m <br />s <br />. <br /> _.~ <br />. . <br /> • . <br />. <br /> ~~~I i:cm ~ -~- - ~ <br />Item . uanti t Unit Unit Price ~ Total <br /> No. <br /> 24. 4" Concrete Sanitary Sewer Plug. 2 h <br />E 86 1.72 <br /> te in lace <br />f <br />C ~ ac . <br /> e <br />om <br /> 25. G" Concrete Sanitary Sewer Plug <br />~ <br />1 <br />Each <br />1.25 <br />1.25 <br /> Com fete in lace <br /> 26. Road Shell or crushed limestone. <br /> for road, shoulder, dri vet•~ay, - _ . <br /> etc. Repairs (Delivery ticket <br />basis Complete in lace <br />122.46 <br />O.Y. <br />10.00 <br />1,224.60 <br /> <br /> 27. Timber ordered left in <br />0 1000 <br />Q <br />F <br />00 <br />10 , <br />- 0 - <br /> h <br />T - <br />- . <br />. . <br /> renc <br /> 28. Removing existing concrete <br /> driveways and replacing with <br />0 <br />Y <br />S 00 <br />20 - 0 - <br /> ete drivewa <br />4" - <br />- . <br />. . <br /> concr <br /> 28a Clearing and Grubbing, leaving <br />debris stacked in ri ht-of-wa <br />100% Lump <br />Sum <br />1,000.00 <br />1,000.00 <br /> 29. Removing existing flexible <br /> base pavement and replacing <br /> with 8" cement stabilized <br /> shell base and 1-1/2" Type <br />"F" Hot Mix~As halt Surface _ 0 - S.Y. 10.00 - 0 - <br /> TOTAL WORK COMPLETED $144,992.70 <br /> <br /> <br /> ` 1 <br /> <br />• <br /> c <br /> - <br />.. _, <br />
The URL can be used to link to this page
Your browser does not support the video tag.