Laserfiche WebLink
~'. <br />~ .~ <br />w~ <br />.,,~ <br />~' • <br />Y ~ .Page Two - City of La Porte - South Side Sanitary Sewers, Job No. 74-1132 <br />~~ McKey Construction & Equipment Rentals, Inc, - Estimate 4 <br />~ . <br />~~ - <br /> <br /> <br />• <br />tem <br />No. <br />Item <br />uantit <br />Unit <br />Unit Price <br />Total <br /> <br />7. 15" V.C. Sanitary Sewer,- <br /> R.G. Joints 8 - 10' cut <br />Com lete in lace <br />945 <br />L.F. <br />11.70 <br />11,056.50 <br />8. 21" V.C. Sanitary Sewer, <br /> R.G. Joints 8 -- 10' cut ~ <br />Com lete in lace <br />150 <br />L.F. <br />- 18.63 2,794.50 <br />9. 21" V.C. Sanitary Sewer, <br /> R.G. Joints 10 - 12' cut °: <br /> Com lete in lace 659 L.F. 26.86 17,700.74 <br />10. 8" C.I. Sanitary Sewer Pipe, <br /> AG~lI~!A Class 150 0 - 6' cut _ _ <br /> Com lete in lace Deleted L.F. 13.57 D E L E T E D <br />11. 8" C.I. Sanitary Sewer Pipe, <br /> Atd4JA Class 150 6 - 8' cut <br /> Com lete in lace Deleted L.F. 14.35 D E L E T E D <br />12. Sanitary Sewer Manhole <br /> Complete in lace 28 Each 400.00 11,200.00 <br />13. Extra Depth for Sanitary <br /> Sewer Manhole in excess Vert <br /> of 8 feet - 0 - Feet 40.00 - 0 -___ <br />14. 8" V.C. Sanitary Sewer, <br />* R.G. Joints by angered <br /> const. Com fete in lace Deleted L.P. 16.00 D E L E T E D <br />14a 8" PVC Sanitary Sewer, <br /> R.G. Joints by tunnel <br /> const. in 12" steel ~ . <br /> casin Com~lete in lace 322 L.P. 40.00 12,880.00 <br /> <br />l5: 8" Cleanouts Complete- ~-~ = - - <br /> in lace ~ i3 Each 75.00 975.00 <br />16. Sanitary Se~~~er Creek <br /> Crossing to include pipe. <br /> supports, 8" steel ,pipe and - <br /> appurtenances.from Sta 19-00 _ <br /> to lift Sta., Complete fn ~ Lu~p <br /> lace see sKeets 3~& 12 ~ ~ 90% Sum ~17 000.00 15,300.00 <br />