My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1975-06-02 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1975
>
1975-06-02 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:51 PM
Creation date
3/21/2025 1:32:19 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/2/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Page Four - City of La Porte - South Side Sanitary Sewers, Job No. 74-1132 <br />trcKey Construction & Equipment Rentals, Inc. - Estimate 4 <br /> <br />L <br />C~ <br />I tefTl <br />No. Item uantit Unit Unit Price Total <br />24. 4" Concrete Sanitary Sewer Plug <br /> Com lete in lace 58 Each ~ .86 49.88 <br />25. 6" Concrete Sanitary Set•~er Plug . <br /> Com lete in place 3 Each 1.25 3.75 - <br />26. Road Shell or crushed limestone - <br /> for road, shoulder, drive ray, <br /> etc. Repairs (Delivery ticket <br /> basis) Corn lete in lace 670.78 C.Y. 10.00 6,707.80 <br />27. Timber ordered left in 1000 - <br /> Trench - - 0 - B.F~. 10.00 - -- 0 - <br />28. Removing existing concrete <br /> driveways and-replacing with ~~ ~ - - <br /> 4" concrete drive~•ra - 0 - S.Y. 20.00 - 0 - <br />28a Clearing and Grubbing, leaving Lump <br /> debris stacked in ri ht-of-wa R11 Sum 1,000.00 1,000.00 <br />29. Removing existing flexible ~ - <br /> base pavement and replacing ~ • <br /> with 8" cement stabilized - <br /> shell base and 1~-1/2" Type <br /> "F" Hot ldix As halt Surface ~ - 0. - S.Y. 10.00 - 0 - <br />- - ~ ~ TOTAL WORK COtfPLETED $228,289.02 <br />EXTRA WORK AUTHORIZED BY THE CITY <br />. ., <br />657 L~.F: ~ 6" V.C. Service Line @ $5..08 <br />40 L.F. 6" SDR-26 PVC Service Line @ $6.46 <br />2 Each 8 x 6 V.C. Wyes @ $9.70 <br />1 Each 6 x 6 V.C. Wye @ $6.40 <br />8 Each ~6 .x.4. V.C. Wyes @ $6.40. ~. ~ _,1. <br />.; <br />• TOTAL EXTRA WORK <br />.. <br />. ~ ;. <br />~i ~ TOTAL WORK COMBINED <br />. ~ -_ ~ , <br />. ._ ~ .. .. <br />- <br />.. ~. . <br />• i o - i <br />t - ~~ <br />~ i~ <br />i <br />~' <br />I. . <br />$3,337.56 <br />258.40 <br />19.40 <br />6.40 <br />51 .20: _.: ~~ <br />$3,672.96 <br />~~ $231 ,961 .'98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.