Laserfiche WebLink
• ' • <br />BUSCI-l, HUTCHISON & ASSOCIATES, INC. CONlUI.TIN4 RNOINCCptf <br />tt07 FLtRTWOOD ORiVt - lAYTOWN, TRXA! 77010 -NONt (71!) I2t•SitB <br />i <br /> <br />;; <br />w: <br />~. <br />~~ <br />DATE: August 1, 1975 ~, <br />ESTIMATE NUMBER: Five (5) - June 1, 1975 throu4h July 31, 1975 <br />PROJECT: City of La Porte - Construction of Sanitary Sewers, South Side -Job No. 74-1132 <br />CONTRACTOR: McKay Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, Texas <br />AMOUNT OF CONTRACT: $241,632.37 CONSTRUCTION TIME: 90 Working Oays <br />tam <br />No. Item uantit Unit Unit Price Total <br />1. 8" V.C. Sanitary Sewer, <br /> R.G. Joints 0 - 6' cut <br /> Com late in lace 5 900 L.F. 5.i5 30 385.00 <br />2. 8" V.C. Sanitary Sewer, <br /> R.G. Joints 6 - 8' cut <br /> com late in lace 927 L.F. 5.47 5,070.69 <br />* 2a 8" PVC Sanitary Sewer, <br /> R.G. Joints 0 - 6' cut <br /> Com late in lace 232 L.F. 9.00 2,088.00 <br />* 2b 8" PYC Sanitary Sewer, <br /> R.G. Joints 6 - 8' cut <br /> Com late in lace 40 L.F. 10.00 400.00 <br />3. 72" V.C. Sanitary Sewer, <br /> R.G. Joints 0 - 6' cut <br /> Com late in lace. 1,375 L.F. 6.26 8,607.50 <br />4. 12" V.C. Sanitary Sewer, <br /> R.G. Joints 6 - 8' cut <br /> Cam late in lace 50 L.F. 7.10 10 650.00 <br />5. 12" V.C. Sanitary Sewer <br /> R.G. Joints 8 - 10' cut <br /> Com late in lace L.F. 9.35 13 426.60 <br />6. 12" V.C. Sanitary Sewer <br /> R.G. Joints 10 - 12' cut <br /> Com late in lace 9 L.F. 17.58 28 040.10 <br />6a 12" V.C. Sanitary Sewer <br /> R.G. Joints 12 - 14' cut <br /> Com late in lace ~ L.F. 26.00 8 762.00 <br />*New Items <br />