Laserfiche WebLink
1 <br />• , <br /> <br />:~ <br />R, <br />a~ <br />b, <br />t <br />Y~ <br />• <br />• <br />Page Four - City of La Porte - South Side Sanitary Sewers, Job No. 74-1132 <br />McKey Construction b Equipment Rentals, Inc. - Estimate 5 <br />tem <br />No. Item uantit Unit Unit Price Total <br />24. 4" Concrete Sanitary Sewer Plug <br /> Com lete in Lace 58 Each .86 49.88 <br />25. 6" Concrete Sanitary Sewer Plug <br /> Com lete in lace 3 Each 1.25 3.75 <br />26. Road Shell or crushed limestone <br /> for road, shoulder, driveway, <br /> etc. Repairs (Delivery ticket <br /> basis Com lete in lace 864 C.Y. 10.00 <br />27. Timber ordered left in 1000 <br /> Trench - 0 - B.F. 10.00 - 0 - <br />28. Removing existing concrete <br /> driveways and replacing with <br /> 4" concrete drivewa - 0 - S.Y. 20.00 - 0 - <br />28a Clearing and Grubbing, leaving Lump <br /> debris stacked in ri ht-of-wa 100 Sum 1 000.00 1 000 <br />29. Removing existing flexible <br /> base pavement and replacing <br /> with 8" cement stabilized <br /> shell base and 1-1J2".Type <br /> "F" Not Mix As halt Surface - 0 - S.Y. 10.00 ~ - 0 - <br />TOTAL WORK COMPLETED $242 800.52 <br />EXTRA WORK A~ <br />657 L.F. <br />40 L.F. <br />2 Each <br />1 Each <br />8 Each <br />JTHORIZED BY THE CITY <br />6" V.C. Service Line @ $5.08 <br />6" SDR 26 PVC Service Line @ $6.46 <br />8 x 6 V.C. Wyes @ $9.70 <br />6 x 6 V.C. Wye @ $6.40 <br />6 x 4 V.C. Wyes @ $6.40 <br />Outside lights at lift station <br />TOTAL EXTRA WORK <br />$3,337.56 <br />258.40 <br />19.40 <br />6.40 <br />51.20 <br />71.79 <br />$3,744.75 <br />TOTAL COMBINED WORK <br /> <br />$246545.27 <br />o <br />