Laserfiche WebLink
~` i <br />• <br />Page Two - City of La Porte - South Side Sanitary Sewers, Job No. 74-1132 <br />• MCKey Construction E~ Equipment Rentals, Inc. - Estimate <br /> <br /> <br />em <br />No. Item uantit Unit Unit Price Total <br />?. 15" V.C. Sanitary Sewer, <br /> R.G. Joints 8 - 10' cut <br /> Com lete in lace 94 L.F. 11.70 056.50 <br />8. 21" V.C. Sanitary Sewer, <br /> R.G. Joints 8 - 10' cut <br /> Com lete in lace 150 L.F. 18.63 2 794.50 <br />9. 21" V.C. Sanitary Sewer, <br /> R.G. Joints 10 - 12' cut <br /> Com fete in lace L.F. 26.86 17 700.74 <br />10. 8" C.I. Sanitary Sewer Pipe, <br /> AWWA Class 150 0 - 6' cut <br /> Com lete in lace Deleted L.F. 13.57 D E L E T E D <br />11. 8" C.I. Sanitary Sewer Pipe, <br /> AWWA Class 150 6 - 8' cut <br /> Com lete in lace Deleted L.F. 14.35 D E L E T E D <br />12. Sanitary Sewer Manhole <br /> Cam lete in lace Each 400.00 13 600.00 <br />13. Extra Depth for Sanitary <br /> Sewer Manhole in excess Vert <br /> of 8 feet 30.35 Feet 40.00 1 214.00 <br />14. 8" V.C. Sanitary Sewer, <br />* R.G. Joints by angered <br /> const. Com lete in lace Deleted L.F. 16.00 D E L E T E D <br />14a 8" PVC Sanitary Sewer, <br /> R.G.~Joints by tunnel <br /> const. in 12" stee l <br /> casin Com lete in lace 322 L.P. 40.00 12 880.00 <br />15. 8" Cleanouts, Complete <br />~ <br /> in lace 13 Each 75.00 9.75.00 <br />16. Sanitary Sewer Creek • <br /> Crossing to include pipe <br /> supports, 8" steel pipe and <br /> appurtenances from Sta 19fi00 <br /> to lift Sta.; Complete fin Lump <br /> iace see sheets 3 & i2 All Sum 17 000.00 17 000.00 <br />.~ <br />~~ ,. <br />~~, x , <br />