Laserfiche WebLink
Page Four - City of La Porte - South Side Sanitary Sewers, Job No. 74-1132 <br />• McKey Construction & Equipment Rentals, Inc. - Estimate <br /> <br />tem <br />No. Item uantit Unit Unit Price Total <br />24. 4" Concrete Sanitary Sewer Plug <br /> Com lete in lace 58 Each .86 49.88 <br />25. 6" Concrete Sanitary Sewer Plug <br /> Com lete in lace 3 Each 1.25 3.75 <br />26. Road Shell or crushed limestone <br /> for road, shoulder, driveway, <br /> etc. Repairs (Delivery ticket <br /> basis Com lete in lace 864.78 C.Y. 10.00 8 647.80 <br />27. Timber ordered left in 1000 <br /> Trench - 0 - B.F. 10.00 - 0 - <br />28. Removing existing concrete <br /> driveways and replacing with <br /> 4" concrete drivewa - 0 - S.Y. 20.00 - 0 - <br />28a Clearing and Grubbing, leaving Lump <br /> debris stacked in ri ht-of-wa 100 Sum 1 000.00 1,000.00 <br />29. Removing existing flexible <br /> base pavement and replacing <br />' with 8" cement stabilized <br /> shell base and 1-1/2" Type <br /> "F" Hot Mix As halt Surface 550 S.Y. 10.00 5 500.00 <br />TOTAL WORK COMPLETED $248,300.52 <br />EXTRA ITEMS <br />utsi a .ig is as Lift Station <br />657 L.F. 6" V.C. Service Line @ $5.08 <br />40 L.F. 6" SDR 26 PVC Service Line @ $6.46 <br />2 Each~;8 x 6 V.C. Wyes @ $9.70 <br />1 Each ~' 6 x 6 V.C. •Wyes @ $6.40 <br />8 Each 6 x 4 Y.C. Wyes @ $6.40 <br />$ 71.79 <br />3,337.56 <br />258.40 <br />19.40 <br />6.40 <br />51.20 <br />V , I TT . / J <br />TOTAL COMBINED WORK $252,045.27 <br />Less Previous Payments.. 221,890.74 <br />FINAL AMOI~NT DUE $ 30,154.53 <br />1 <br />L1-GfY~~ <br />• J mes P. Hutchison, P.E. <br />ce President ;~ <br />-. <br />JPH/sh <br />