My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-05-17 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1976
>
1976-05-17 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:21:48 AM
Creation date
3/21/2025 1:32:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/17/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTINOlNOINEERf <br />1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (713) 422•62tS <br />May 13, 1976 <br />Honorable Mayor and City Commission <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br />PROPOSAL TO PREPARE A COMPREHENSIVE, DETAILED ENGINEERING STUDY RELATING <br />TO LA PORTE'S POSSIBLE CONVERSION FROM A GROUND WATER SUPPLY TO A SURFACE <br />WATER SUPPLY FOR DOMESTIC USE <br />Gentlemen, the referenced study for the City of La Porte would include <br />information about, but would not necessarily be restricted to, the <br />following: <br />1. Source or sources of raw water; <br />2. Probable point of delivery of raw water; <br />• 3. Possible water treatment plant site; <br />4. Required raw water transmission lines; <br />5. Estimated delivered cost of raw water, present and future; <br />6. Estimated date of availability of raw water; <br />7. Population and water demand, present and future; <br />8. Estimated cost of water treatment plant site;` <br />9. Estimated cost of water treatment plant and cost of future expansions; <br />10. Estimated cost of operation of treatment plant facilities, including <br />amortization, labor, maintenance, chemicals, etc.; <br />11. Estimated cost of treated or potable water transmission lines, if <br />required; <br />12. Estimated capital outlay, present and future; <br />13. Estimated increased charges to water customers to cover higher cost <br />• of water treatment and transportation if water supply is converted to <br />treated surface water, present and future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.