Laserfiche WebLink
BUSCH. HUTC H'SON & ASSOCIATES. INC. CONSULTING[NGIN[[fIS <br />1107 •LQ[TWOOD DRIV[ — 0AYTOWN. TKXAS 77020 ►HON[ (712( 422-t21s <br />41ctober 1, 1976 <br />ESTIMATE NUMBER: Two (2) - September 1, 1976, through September 30, 1976 <br />Job No. <br />PROJECT: City of La Porte - SanitarX Sewers to Serve La Porte Municipal Airport- 76-1320. <br />R. T. B s op Construction Co., Inc. <br />CONTRACTOR: and R. T. Bishop, A Joint Venture, P. 0. Box 961, Baytown, Texas 77520 <br />AMOUNT OF CONTRACT: $34,238.98 CONSTRUCTION TIME: 45 Working Days <br />Item <br />No. <br />Item <br />QuAntity <br />"t <br />Unit Price <br />TotAl <br />1. <br />8" V.C. Sanitary Sewer, R.G. <br />joints, 8' - 10' cut, <br />Complete in lace <br />1,175 <br />L.F. <br />7.39 <br />8,683.25 <br />2. <br />8" Y.C. Sanitary Sewer, R.G. <br />Joints, 6' - 8' cut, <br />Complete in lace <br />500 <br />L.F. <br />6.39 <br />3,195.00 <br />3. <br />8" V.C. Sanitary Sewer, R.G. <br />Joints, Augered Construction <br />Com lete in place <br />80 <br />L.P. <br />12.89 <br />1,031.20 <br />4. <br />8" P.V.C. Sanitary Sewer, <br />R.G. joints, SDR 35 by <br />Augered Construction, <br />795.00 <br />Complete in lace <br />60 <br />L.F. <br />13.25 <br />5.' <br />6" V.C. Sanitary Sewer, R.G. <br />joints, 6' - 8' cut, <br />fete in lace <br />600 <br />L.F.Com <br />4,98 <br />2,988.00 <br />6. <br />6" V.C. Sanitary Sewer, R.G. <br />joints, 0' - 6' cut, <br />Complete in lace <br />970 <br />L:F . <br />4.73 <br />4,588.10 <br />7. <br />6" V.C. Sanitary Sewer, R.G. <br />joints, Augered Construction <br />Complete in Place <br />30 <br />L.F. <br />9.98 <br />299.40 <br />8. <br />Sanitary Sewer Manhole, <br />standard depth to 8 feet <br />deep, Complete in place <br />8 <br />Each <br />600.00 <br />4,800.00 <br />9. <br />Extra depth for Sanitary <br />- <br />. <br />Sewer Manhole in excess <br />of 8 feet <br />8 <br />V.F. <br />75.00* <br />600.00 <br />