My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1977-02-07 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1977
>
1977-02-07 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
3/21/2025 1:33:20 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/7/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page"Two _ City of La fte - Construction. of Fairmont~k Recreational Facilities <br />Chatham Construction Company - Estimate iJo. 5 <br />o. Item ~ uantit ~Unit 1 Unit Price. ~ Total <br />10. lJater Service, 2" RVC <br /> Pipe and Tap to main, <br /> Con~~lete in place 390 L.F. ~ 1.58 ~ 616.20 <br />11. Sanitary Sewer Service, <br /> 6" PVC Pipe and Manhole .Tap <br /> <br />Com lete in lace <br />440 <br />L.F. 4.25 1,870.00 <br />12. Limestone Parking Lot, 6" <br /> Compacted Thickness <br /> including Lime Stabiliza- <br /> tion of Subgrade, Complete 99% of <br /> . in place ~ 4,700 S.Y. 6.81 ~ 31,686.93 <br />13. ! Base Sets, including three <br /> ' Field Bases and Home Piate, <br /> as specified on the draw- <br /> in s, Com lete in lace - 0 - Each ~ 401.40 - 0 - <br />14. ~ Portable Pitching Mound <br /> as s ecified on drawin s - O - Each 643.50 ~ - 0 - <br />15.~ Spectator Bleachers as <br />r specified on drawings, <br /> complete in place - 0 - Each , 741.75 - 0 - <br />16. Asphalt Surface Drive <br /> including lime Stabiliza- <br />. lion of Subgrade, 8" <br /> cement stabilized shell <br /> base and 1-1/2 thick ' <br /> asphalt concrete surface, 95% of <br />~ Com lete in lace 580 S.Y. 7.81 4,303.31 <br />17.i Break out existing curb <br />~ and construct concrete <br />~ ramps and curb returns at <br />3 locations, including <br />lime stabilization of <br />! Subgrade, Complete in ~ Lumpi~ <br />~ <br />ace All , Sum k 2,400.00 2,400.00 <br />18.~ Project Sign as shown on ' <br />fans, Com lete in lace - - <br />0 ~Eacn 2,112.00 ~ - 0 - <br />{{ <br />TnTat wnRK cnNpi ~-r~n I X180.399.68 <br />MATERIAL ON HAND - <br />Spectator Bleachers @ InYOi_ce Price $4,040.00 <br />TOTAL WORK COMPLETED PLUS MATERIAL ON HAND $184,439.68 <br />,... ,~._ <br />,. .~ <br />..: .. .. <br />.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.