My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1977-06-13 Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1977
>
1977-06-13 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:53 PM
Creation date
3/21/2025 1:33:40 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/13/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'Page T\'1o - City of La p_e - Construction of ~airmont .k Recreational Facilities <br />Chatham Construction Company - Estimate Ho. 8 <br /> <br /> f . <br /> No. Item I Quantity Unit Unit Price! Total I <br /> 10. Water Service, 2" PVC ' <br /> Pipe and Tap to main, 1.58 <br /> Complete in place 390 L.F. 616.20 <br /> 11. Sanitary Sewer Service, <br /> 6" PVC Pipe and Manhole T~p 4.25 I <br /> Complete in place 440 L.F. 1.870.00 <br /> . <br /> 12. Limestone Parking Lot~ 6" <br /> Compacted Thickness <br /> including Lime Stabiliza- <br /> tion of Subgrade, Complete <br /> in place 4.458 S.Y. 6.81 30,358.98 <br /> I <br /> 13. Base Sets, including three i <br /> I <br /> Field Bases and Home Plate, t <br /> as specified .on the draw- I <br /> I <br /> ings, Complete in place 5 Each 401.40 2,007.00 I <br /> , <br /> , <br /> 14. Portable Pitching Mound l I <br /> as specified on drawinas 4 Each -0 .0. ~ 643.50 2,574.00 <br /> . <br /> .. <br /> 15. Spectator Bleachers as <br /> specified on drawings, <br /> comolete in place 8 Each 741.75 .. 5,934.00 <br /> 16. Asphalt Surface Drive <br /> including lime stabiliza- <br /> tion of subgrade, 8" <br /> cement stabilized shell <br /> base and 1-1/2 thick <br /> asphalt concrete surface, 588 4,592.28 00 . . <br />. . ~- ~.. ../ Complete in place~ ._.......~o..__ S.Y. ~.~._- -- . -~- 7.81 ----- <br /> 17. Break out existing curb <br /> and construct concrete <br /> ramps and curb returns at <br /> 3 locations, including <br /> lime stabilization of <br /> subgrade, Complete in Lump <br /> place All Sum 2,400.00 2,400.00 <br />I 18. Project Sign as shown on I <br /> plans. Como1ete in place 90% of 1 Each 2,112.00 1,900.80 <br />, <br /> , TOTAL WORK: COMPLETED $213,432,00 <br /> .. <br /> <br />. <br /> <br />I <br />! <br />i <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />., <br />I <br /> <br />e <br /> <br />.) . <br />\ ' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.