<br /> December 8, 1976
<br /> ) Four (4) - October 15, 1976, through December 8, 1976
<br /> ESTIMATE NUMBER:
<br /> ; Job
<br /> fRQJ ECr: City of La Porte- Construction of Fairmont Park Recreational Facilities -No. 74-1H
<br /> CONTRACTOR: Chatham Construction Company, 1309 Jefferson, Bay town, Texas 77520
<br /> AMOUNT OF CONTRACT: $213,869.04 CONSTRUCTION TIME: 120 Working Days
<br /> 'No. Item Quantity Un i.t Unit Price Total
<br /> 1. Concesston/Scorekeeper/Rest-
<br /> room Bui.1dtng, including site
<br /> ~re~aratton, slab, plumbing,
<br /> tx ures, totlet partitions,
<br /> cabtnets, signs, concrete
<br /> .. , walk, patnttng, Complete to 98% Lump 25,676.00
<br /> place Sum 26,200.00
<br /> l. Bal1fte1ds, i'ncluding 100
<br /> C.Y'. tnfte1d fill, final
<br /> dressing, preparatiun for
<br /> seedtng, seedtng, concrete
<br /> dugout, pads, benches and - 0 - 3,557.00 - 0 -
<br /> roofs, Complete i~ place Each
<br /> I 3. Backstops as shown on the
<br /> Drawing, Complete in place - 0 - Each 1,892.00 - 0 -
<br /> 4. Ballfield Fence; 6' High,
<br /> Complete in place - 0 - lo F. 4.30 - 0 -
<br /> 5. Ballfield Fence, 10' High,
<br /> Complete in place - 0 - loF. 7.75 - 0 -
<br /> 6. Ballfield Fe~~e, 15' High,
<br /> Complete in place - 0 - L.F. 10.19 - 0 -
<br /> 7. Gate, 3', Complete in
<br /> place - 0 - Each .152.25 - 0 -
<br /> 8. Gate, 15' Double, Complete
<br /> in place - 0 - Each 275.73 - 0 -
<br /> .
<br /> 9. Electrical, including, t
<br /> wire conduit, fittings,
<br /> fixtures. poles, switch-
<br /> gear, service to building,
<br /> complete in place 99% Lump 93,139.20
<br /> BASE BID (Ouartz L1Qhts) Sum 94,080.00