Laserfiche WebLink
• • <br />SIiARITIG CONSTRUCTION COST OF 18" TRUNK LINE <br />• Total Construction Cost 18" Trunk Line $ 37,261,00 <br />Extra Work Items <br />Relocate Fower Pole 680.00 <br />Core Borings 126.00 <br />$ jtS,067.UU <br />Engineering @ 10°0 3,806,70 <br />Total Cost $ 41,873.70 <br />COST S?iARING BREAKING DOWN <br />Glen I~ieadows S~D ~ 27.5 $ 10,468.43 <br />Fair;ont Park l~dorth '~ 23.81 9, 059.95 <br />Fairmont Park West, Section I @ 15.31 5,824.25 <br />School Site @ 4.21 1,598.81 <br />Fairmont Park West, Seetion II C~ 20.81 7,917.94 <br />Fairmont Fark 1~Iest, Reserve @ 8.4 0 3,197.62 <br /> $ 38,067.00 <br />~NCIr,-EI,;RIIVG <br />Glen I•`_eadows S~D ~ 27.51 $ 1, 046, 84 <br />City of La Porte ~ 19.51 742.31 <br />Fairmont Fark, Joint Venture ~ 531 2,017.55 <br /> $ 3,806.70 <br />TOTAL COST <br />Glen Meadows S~D $ 10,468.43 <br />City of La Porte 7,423.06 <br />Fairmont Fark, Joint Venture -~~~' 20,175.51 <br />$ 38,067.00 <br /> <br />