My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1978-08-16 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1978
>
1978-08-16 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:53 PM
Creation date
3/21/2025 1:34:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/16/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ~r r~ ~ . <br />~' .. ~ <br />~ , .~ Y <br />r <br />r Texas Department of Health <br />Fratis L Duff, M.D., Dr.P.H. 1100 West 49th Street Members of the Board - <br />Commissioner Austin, Texas 78756 - <br />`458-7111 Robert D. Moreton, Chairman <br />Raymond T. Moore, M. D. William J. Foran, Vice-Chairm= <br />Deputy Commissioner Roderic M. Bell, Secretary <br />Johnnie M. Benson <br />H. Eugene Brown <br />} - Ramiro Casso <br />i July 7, 1978 Charles Max Cole <br />Francis A. Conley -- <br />} - Ben M. Durr <br />i William J. Edwards <br />Raymond G. Garrett <br />r <br />Bob D. Glaze <br />Mr. John T. BOgren Blanchard T. Hollins <br />4. Municipal Engineering Company Donald A. Horn <br />' Engineers and Surveyors Maria LaMantia <br />Philip Lewis <br />3425 Federal Road Ray santos <br />Pasadena, Texas 77504 Royce E. Wisenbaker <br />Subject: Water Distribution System Improvements <br />Glen Meadow, Section Two <br />1 City of La Porte _ <br />{ Harris County, Texas <br />Dear Mr. Bogren: <br />r <br />• We have received your letter of July 5, 1978, transmitting planning material <br />for the installation of 6 and 8 inch water lines along with hydrants, valves, <br />fittings and related appurtenances to provide service to Section 2 of the <br />referenced subdivision. <br />We have completed our review of the planning material and it appears to have <br />been prepared in general conformity with good public health engineering practices <br />and meets our ctirrent standards.. <br />Your cooperation in submitting this planning material for our review is appreci- <br />ated, and we hope that the proposed facilities can be provided at an early date. <br />If we may be of assistance in the future, please let us know. <br />Very truly yours, <br />C. W. McCarty, P.E., C~h/ief <br />Plan Review Branch <br />Division of Water Hygiene <br />FGH:js <br />cc: City of La Porte <br />cc: Harris County Health Dept. <br />• cc: Public Health Region 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.