My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1978-11-29 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1978
>
1978-11-29 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
3/21/2025 1:34:58 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/29/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> <br />i <br />CFIA~~~GE ~ OWNER ^ <br />ARCHITECT ^ <br />OIZD'ER CONTRACTOR ^ <br />FIELD ^ <br />AIA JCUMENT G701 OTHER <br />PROJECT: A City Hall Building for the CHANGE ORDER NUMBER: 1 <br />(name, address) City of LaPorte <br />Harris County, Texas <br />70 (Contractor) <br />(- P.G. Bell Company ~ ARCHITECT'S PROJECT NO: 276-77 <br />4511 Dacoma CONTRACT FOR: A City Hall Building <br />Houston, Texas 77501 for the City of LaPorte <br />L. ~ 'CONTRACT DATE: <br />You are directed to make the following changes in this Contract: . <br />Item #1. Specified Allowances not used <br />Testing <br />Hardware <br />Graphics <br />Item #2 Delete tackboards from the contract <br />Item #3 Delete west entrance drive <br />Item #4 Install water and drain in atrium <br />Item #5 Install electrical work in telephone <br />equipment room as per S.W. Bell require. <br />Item #6 Partition changes in rooms 125 & 126 <br />Item #7 Reduce contract price for plaster work <br />Item #8 Install seal coat on parking lot <br />Item #9 Extension of Contract date due to rain, <br />strikes, etc. - 35 days <br />September 26, 1977 <br />ADD DEDUCT . <br />~1, 0 <br />3,344.00 <br />73.00 <br />296.00 <br />564.00 <br />X206.00 <br />938.00 <br />no change <br />600.00 <br />no change <br />~ , 44.00 <br />$~S8 .00 <br />The original Contract Sum was <br />Net change by previous Change Orders <br />The Contract Sum prior to this Change Order was . <br />The Contract Sum will be•Eiwere~aeed) (decreased) wed) by this Change Order . <br />The new Contract Sum including this Change Order will be <br />The Contract Time will be (increased) (d~e~) (~Ci) by <br />The Date of Completion as of the date of this Change Order therefore is <br />Doughtie & Porterfield <br />ARCHITECT <br />.$~_ ~~st`.Pasadena S t _ Rk <br />Pasad na, Tex, 7750,2 ~ <br />• BY <br />A ~~ <br />• • ~ 663, 000, oo <br />. $ <br />• ~ 663, 000.00 <br />• • $ 5, 437.00 <br />• • ~ 657, 563.00 <br />( 35) Days. <br />June 7, 1978 <br />P.G. Bell Company City of LaPorte <br />CONTRACTOR W ER <br />P_0. Rox 26,~i1 Box 1115 <br />Address Address <br />Houston, Tex 7 1 LaPorte, Texas 77571 <br />~~~ <br />BY <br />DAf ~D <br />BY <br />DATE <br />AIA DOCUMENT G701 CHANGE ORDEK APRIL 1970 EDITION AIA© ©1970 THE ONE PAGE <br />AMERICAN INSTITUTE OF ARCHIT[CTS, 1735 NEW YOKK AV[., NW, WASHINGTON, D.C. 2000G <br />
The URL can be used to link to this page
Your browser does not support the video tag.