My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1978-12-06 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1978
>
1978-12-06 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
3/21/2025 1:35:00 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/6/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />EON PIPELINE COMPANY <br />POST OFFICE BOX 2220 • HOUSTON, TEXAS 77001 <br />WM. H HUFFMAN <br />MANAGER. RIGHT OF WAY. CLAIMS 8 PUBLIC AFFAIRS <br />November 3, 1978 <br />Two Proposed 6-Inch Pipelines <br />Crossing North "D" Street <br />City of La Porte, Harris County, <br />Texas <br />Mrs. M. Goyen <br />City Secretary <br />City of La Porte <br />Post Office Box 1115 <br />La Porte, Texas 77571 <br />Dear Mrs. Goyen: <br />Exxon Pipeline Company proposes to construct two (2) six- <br />inch (6") pipelines (one ethylene, one propylene) that <br />will be crossing the City of La Porte. Attached are <br />detailed drawings showing our proposed crossing of North <br />"D" Street, approximately 1.7 miles west of State High- <br />way No. 146. <br /> <br />JAH:elj <br />Attachments <br />Sincerely, <br />~?~~ - -r; <br />~~~ <br />J. A. Huerta <br />cc: Mr. P. M, Jeffers, Jr. <br />The pipelines are to be installed with a minimum cover <br />of four feet (4`). The operating pressure of the propy- <br />lene line will be 1440 psig, the ethylene 1600 psig. <br />The pipelines will be of steel, 6.625 O.D., API 5LX-52 ERW, <br />and have a wall thickness of .219. <br />Also attached is Exxon Pipeline Company's draft number <br />14164 in the amount of $600.00, as required. A permit <br />for this proposed pipeline is requested. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.