Laserfiche WebLink
• • <br />• <br />C. Application for Waste Control <br />Permit (if required) made no later than completed days <br />after Public Hearing notice for Facility <br />Plan is issued. <br />D. Final Environmental Assessment and <br />Facility Plan (including time for draft <br />reports, advertisement & hearing) <br />completed and submitted to the State completed days <br />after Step 1 grant award. <br />STEP 2 <br />A. User Charge System and Industrial <br />Cost Recovery System (if required) <br />developed and submitted to the State 90 days <br />after Step 2 grant award. <br />• B. Preliminary Plan of Operation (if required) <br />completed and submitted to the State 30 days <br />after Step 2 grant award. <br />C. Final Plans and Specifications, <br />completed and submitted to State 270 days <br />after Step 2 grant award. <br />STEP 3 <br />A. Advertise for Construction Bids within 45 days <br />after authorization to advertise for <br />bids has been issued. <br />B. Submit Bid Opening Documents within 30 days <br />after authorization to advertise for <br />bids has been issued. <br />C. Award of Construction Contract within 7 days <br />after authorization to award the contract <br />has been issued. <br />• D. Initiation of Construction within 30 days <br />after the award of the contract. <br /> <br />TUW R•OG70 <br />P.n. 7 w( 7- _ <br />