Laserfiche WebLink
<br />• <br />Estimate of Quantities Needed <br />to Complete Project <br />Glen Meadows Section II <br />DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br />Excavation 4500 C.Y. $ 1.60 $ 7,200.00 <br />Lime Stabilization 14200 S.Y. $ 0.65 $ 9,230.00 <br />Lime ~ 175 TON $ 60.00 $ 10,500.00 <br />Concrete Pavement <br />( 6" Thick ) <br />11,024 <br />S.Y. <br />$ <br />1 1 25 <br />$ <br />124,020.00 . <br />Concrete Pavement <br />( 7" Thick ) <br />5,010 <br />S.Y. <br />$ <br />13.50 <br />$ <br />67,635.00 <br />• 00 <br />2 <br />Concrete Curb 10,120 L.F. $ 1.60 $ . <br />16,19 <br />Concrete RipRap 25 S.Y. $. 16.00 $ 400.00 <br />• Inlet ( Type "C" ) <br />( 60~ ) <br />12 <br />E.A. <br />$ <br />600.00 <br />$ <br />4,320.00 <br />Inlet ( Type "C" Mod ) <br />2 <br />E <br />A <br />$1 <br />;.000.00 <br />$ <br />1, 200.00 <br />( 60$ ) . <br />. <br /> <br /> TOTAL $ 240,697.00 <br />MUNICIPAL <br />3425 Fede: <br />Pasadena, <br />BY• <br />JOIiN <br />• April 25, <br />ENGINEERING COMPANY <br />ral Road <br />Texas 77504 <br />v _ <br />T . BO REN <br />1979 <br />