My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1979-06-20 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1979
>
1979-06-20 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
3/21/2025 1:35:16 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br /> <br />INTrR OFFICE DSEN1O <br />T0: Jim ~Iudgens , City Ad~rinistrat.or <br />FROAi~: Stan S}ien~ood, Director, Parks and Recreation <br />SUBJECT: Swimming Pool <br />A11 major work on the s~~~imming pool has been completed. All <br />new lines to the pump from the skimn•~ers are in and working fine. <br />The lines from the pump to the water inlets are installed and axe <br />working properly. The original contract was for $15,997.50 but because <br />the inlets into the pool did not need h•orking $1,000.00 was subtracted <br />from the price. <br />During the early part of the construction , it was found that <br />• electrical wiring was embedded in the concrete and had to be replaced <br />for an additional cost of $1,800.00. New fencing was added for an <br />C~ <br />additional cost of $530.00. <br />Two additional items were found in the electrical work.. One <br />ryas the sexy*ice box and main electrical line t}iat ,supplies the motox <br />and pool light was in bad shape and the conduit which it was housed in <br />was rusted in~• two, in several places. This was replaced with schedule <br />40 P.V.C. Also the service line from the pump house to the bath house <br />was in the same condition and was replaced. This was..an additional cost <br />of $1,604.90. <br />Several pipes leading into the bath house wexe rusted and leaking. <br />These pipes ti~~ere replaced at an additional cost of -$514.31. <br />This brought the total to $4,449.21 for add on to the contract, for <br />a total cost of $19,446.71. <br />At present, all repairs are working fine with the cxception~of the <br />pool pump. The age of the pump at the pool and the wear placed on it, we <br />arc having difficulty in kcepi.ng it primed. 1Vitli the heavy use on the <br />pool tlti:~ summer, this requires us to shut the pump down evexy otlicx <br />day to clean the filter out and because of the wear on the pump <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.