Laserfiche WebLink
Jim }tud ens ~ity Administrator • <br />T0. g , <br />FROM: Stan Sherwood, Director Parks and Recreation <br />• SUBJECT: La Porte Swimming Pool , <br />The construction that is going on at the pool, calls for <br />replacing the pipes and decking. Blue prints showed that all <br />electrical lines were six inches under the pool decking. •When <br />the contractor started removing the decking from around the <br />pool, he found that the wiring was inbedded in the concrete, <br />because of this., all wiring around the pool had to be removed <br />with the concrete. <br />X would recommend that we allow Hamilton Construction to <br />replace this wiring as an add on to his contract. Estimated <br />cast is about $1,800.00. <br />,, <br />Also about half of the fencing around the pool that was <br />removed is in very poor condition. Since the contract called <br />for the contractor to put the fencing back up, the City would <br />be only out the expense of buying new fencing and no cost of <br />labor putting the fence up. Y would recommend •that we purchase <br />this additional fencing and Hamilton replace the fence with <br />new fencing instead of the existing old one. The additional <br />cost of the fence would be around $600.00. Also we received <br /> <br />a bill from Bush Iiutchson Eng. for $951.85 for fee's on the <br />pool. This fee along with the fencing and the.~elect"rival <br />was not included in the contractor bid. <br />I would like to recommend that this additional expense <br />of $3,352.00 be expe~ided from the general contingency fund. <br />Stan Shcrwoo <br />Director Parks and Tecreation <br /> <br />