My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1979-07-11 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1979
>
1979-07-11 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
3/21/2025 1:35:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/11/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!T PRICES BID FOR 16" ~~JATER (~1AIPI ON SPEJJCER HIGHWAY FROh9 IJATER WELL hi0. 5 TO VALLEY(3ROOK DRIVE <br /> <br />Item CO A CONSTRUCTION ABLE SERVICES, INC. BE .If~Tr"- <br />J;o. Item uantit Unit nit Price Tota Unit Price Total nit Price Total Unit Price Total <br />24. 12" C.I. Plu ,Com lete-in- lace 1 ach 110.00 100 ~ <br />~25. Fire Hydrant with Hydrolock Con- <br /> nector, 4' Bury, Complete-in- ! <br /> lace 10 Each $ 765.00 $ 7 650.00 600.00 6 000 0 <br />26. Cement Stabilized Sand, as re- <br />. quired by the Engineer, Complete I <br /> in- lace 200 C.Y. $ 20.00 4 000.00 18.00 3 600 00 I <br />21. Road shell or Limestone for <br /> temporary crossings and re- <br /> pair of drives as directed <br /> by the Engineer (Delivery <br /> ticket basis) Complete-in- <br /> lace 500 C.Y. $ 13.65 $ 6 825.00 15.00 7 500 0 ~ <br />28. Timber ordered left in trench 1000 <br /> b En sneer, Com lete-in- lace 2 BdFt $ 200.00 400.00 300.00 I n . <br />29. Remove and replace flexible <br /> base parking area pavement <br /> with 6" cement stabilized <br /> <br />_ . shell and 1-1/2" Type "F" <br />Hot Mix Asphaltic Concrete ~ i <br /> Com lete-in- lace 50 S.Y. $ 65.00 3 250.00 40.00 2 000 <br />T O T A L $284,641.50 291 930.00 $293,625.00 $300,225.00 <br />ADDITIONAL BIDDERS: <br />5. McKey Construction - $308,701.00 <br />6. Bill McDonald Const. - $313,190.00 <br />1. Hassell Const. - $330,568.75 <br />8. Sabine Consolidated - $332,515.00 <br />9. Jalco, Inc. - $344,838.00 <br />10. Marathon Paving - $410,594.50 <br />~. <br />® ~ ~, _. <br />. , .._o.~~.~. -~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.