My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1979-07-11 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1979
>
1979-07-11 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
3/21/2025 1:35:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/11/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> <br /> <br />INTIvR OFFICE PSE44O <br />T0: Jim Hudgens,, City Ad~rinistrator . <br />FRODt~: Stan Sherwood, Director, Parks and Recreation <br />SUBJECT: Swimming Pool <br />All major work on the swimming pool has been completed. All <br />new lines to the pump from the ski.mn•~ers are in and working fine. <br />The lines from the pump to the water inlets are installed and axe <br />working properly. The original contract was for $15,997.50 but because <br />the inlets into the pool did not need ~,~orking $1,000.00 was subtracted <br />from the price. <br />® During the early part of the construction , it was found that <br />electrical wiring ivas embedded in the concrete and lead to be replaced <br />for an additional cost of $1, 800.00. ivTew fencing was added for an <br />additional cost of $530.00. <br />Two additional items were found in the electrical work.. One <br />ryas the service box and main electxical 'line that supplies the motor. <br />and pool light tivas in bad shape and. the conduit which i.t was housed in <br />was rusted in~.two, in. several places. This was replaced with schedule <br />40 P.V.C. Also the service line from the pump House to the bath house <br />was ir, the same condition and was replaced. This iv as. .an additional cost <br />of $1,b04.90. <br />Several pipes leading into the bath House were rusted and leaking. <br />These pipes Caere replaced at an additional cost of $514.31. <br />Tliis brought the total to $4,449.21 for add on to the contract, for <br />a total cost of $19,446.71. <br />At present, all repairs are working fine with tl~e oxception~of the <br />pool pump. Tlic age of tl~e pump at the pool and the wear placed on it, we <br />axe having difficulty in keeping it primed. With the Heavy use on the <br />pool this summer, this reRuires us to shut the pump down every other <br />day to clean the f3. ].ter out and because of the wear on tlic pump <br />
The URL can be used to link to this page
Your browser does not support the video tag.