My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1979-11-28 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1979
>
1979-11-28 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
3/21/2025 1:35:31 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/28/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />Regular Meeting 11/28/79 <br /> <br />11 <br /> <br />21. ADMINISTRATIVE REPORTS - The Administrator requested the <br />Commission consider authorizing adding additional work to <br />the contract for the construction of Farrington Boulevard. <br /> <br />Concrete Apron access points to the parking lot of the baseball <br />complex; estimated cost: <br /> <br />Adjust Drainage Inlets - 2 ea. @ $510.00= <br />7" Class A Reinforced Concrete - 163 sy @ 16.15 sy= <br />Excavation 130 cy @ 2.40 cy= <br /> <br />$1,020.00 <br />$2,632.43 <br />312.00 <br />$3,964.45 <br />396.45 <br /> <br />Plus 10% Engineering Fee <br /> <br />ESTIMATED COST <br /> <br />$4,360.90 <br /> <br />Apron and crossover on Farrington on the North Side of <br />West Main. Estimated cost: <br /> <br />7" Class A <br />Excavation <br />Curbing <br />Dowels <br /> <br />Reinforced Concrete 130 sy <br />50 cy <br />25 If <br />50 ea <br /> <br />@ 16.50 <br />@ 2.40 <br />@ 2.00 <br />@ 2.00 <br /> <br />$2,099.50 <br />120.00 <br />50.00 <br />100.00 <br />$2,369.50 <br />236.95 <br /> <br />sy= <br />cy= <br />If= <br />ea= <br /> <br />Plus 10% Engineering Fee <br /> <br />ESTIMATED COST <br /> <br />$2,606.45 <br /> <br />A copy of the recommendation is attached and made a part of these <br />minutes. <br /> <br />Motion by Commissioner Simons, seconded by Commissioner Cline <br />to authorize the Administrator to add additional work to the <br />contract for the construction of Farrington Boulevard to be <br />funded from the $12,000.00 budgeted in the Capital Improvement <br />Fund; approximately $4,361.00, for the baseball complex; <br />approximately $2,607.00 for the improvement of Farrington and <br />West Main. Motion carried by the following vote: <br /> <br />AYES: Commissioners Tomerlin, Kibodeaux, Cline, and Simons. <br />NAYS: None. <br /> <br />+ <br /> <br />+ <br /> <br />+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.