Laserfiche WebLink
• • <br /> <br /> SE[JER LIhE ESTIriATE <br />SOUTH SEVENTEENTH AND SPENCER HIGIiWAY (GUS BRIDEN) <br />~,.) S~'nPLIES . <br />~ Coast of Fibergl ass ria- nho~e $432.00 <br />SO' SDR 4I 6" P ipe @ $1.38 $110.40 <br />1 .:ye @ $5.79 = $5.79 <br />3 1/8 Bend @ $2 .41 = $7.23 <br />10' /'~" S/40 PVC @ $1.45 = $14.50 <br />13 Yards fill sand (~ $3.95/yard - $51.35 <br />E .) L:'. BO R <br />Chacko Thomas ~~ 1 Hour (~ $10.16 = $10.16 <br />JiT Aarron ~~ 3 Hours (~ $ 8.36 = $25.08 <br />David Davis _ _ _~ 3_ kio~rs @ $ 6,8.6 -- $20.58 <br />John Cole ~~ 3 Hours @ $ 6.86 = $20.58 <br />Rici-:ard Davis ~~ 3 Hours @ $ 6.86 = $20•.58 <br /> <br />Backhoe 3 Hours @ $20.00 = $b0.00 <br />Loader 2 Hours (~ $20.00 = $40.00 <br />Tt-cse estimates do not include Engineering Feo s and are figured <br />• at Deccrrber 1979 Prices. <br /> Total $ 818.25 <br />• <br />