Laserfiche WebLink
~~ <br />• <br />.. <br /> <br /> r>E:~oriANDUM <br /> SEt.TER LINE ESTIMATE <br /> SOiJTH SEVENTEF'NTH AND SPENCER HIGHt.~AY (POLI CE ASS~i) <br /> <br />A.) SUPPLIES <br />i ~ Coast of Fiberglass Manhole = $432.00 <br /> 80' SDR 41 6" Pipe @ $1.38 = $110.40 <br /> 1 Wye @ $5.79 = $5.79 ~ ~~ <br /> 3 1/8 Bend @ $2.41 = $7.23 <br /> 10'/4" S/40 PVC @ $1.45 = $14.50 <br /> I3 Yards f-ill sand (~ $3-95/yard = $51.35 <br />B.) LABOR <br /> Chacko Thomas ~k 1 Hour (~ $10.16 = $10.16 <br /> Jim Barron ~~ 3 Hours (~ $ 8..36 = $25.08 <br /> David Davis ~b 3 Hours (~ $ 6.8b = $20.58 <br /> John Cole ~~ 3 Hours @ $ 6.86 = $20.58 <br /> Richard Davis ~~ 3 Hours @ $ 6.86 = $20.58 <br />C.) EQUIPMENT <br /> Backhoe 3 Hours (~ $20.00 = $60.00 <br /> Loader 2 Hours (~ $20.00 = $40.00 <br />. These estimates do not include Engineering Fees and are figured <br /> at December 1979 Price s. - <br /> Total $818.25 <br />• <br />