Laserfiche WebLink
City of La Porte - #e 2 s <br />If such an interseptor is to be considered within the next 10 <br />years, then it is recommended that the 12" force main be <br />IS <br />installed at this time from Lift Station No. 1. This <br />award would be made to David Wight Construction Co., Inc., <br />Friendswood, Texas, on their low bid of $161,748.00, using <br />ASTM D2241, SDR 26, Class 160 PVC pipe. This would provide <br />some surplus funds for needed repairs to the existing lift <br />station pumps in the Lomax area and for any short extension <br />of sanitary sewers to an area not presently served from the <br />existing system. <br />To adequately serve the present system and to allow for <br />future development of the area to the full capacity of <br />Lift Station No. 1, it is recommended that the 16" force <br />main be constructed, disregarding that any future <br />interseptors would be constructed to relieve this system. <br />This award would be made to McKey Construction & Equipment, <br />Inc., La Porte, Texas, on their low bid of $231,142.00. <br />This would allow for a small surplus of funds for pump <br />repairs. <br />Very truly yours, <br />H. Carlos Smith -Engineers & Surveyors, Inc. <br />r <br />H. Carlos Smith, P.E. <br />President <br />