My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1980-10-15 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1980
>
1980-10-15 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:55 PM
Creation date
3/21/2025 1:36:20 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/15/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• • <br />CITY OF LA <br />PHONE ( 713 ) 471 .5020 • P. O. Box 1 1 15 <br />PORTS <br />• LA PORTS, TEXAS 77571 <br />• <br />September 16, 1980 <br />• <br />PLT Engineering, Inc. <br />1160 Dairy Ashford, Suite 600 <br />Houston, Texas 77079 <br />Attention: C.S. Williams, Jr., P.E. <br />Senior Project Director <br />RE: Air Products & Chemicals, Inc. <br />10-Inch C02 Pipeline, La Porte, Tx. <br />PLT Job No. 1294 <br />Dear Mr. Williams: <br />With reference to your letter of July 4, 1980 requesting • <br />The following criteria shall be met during construction <br />within the City limits of La Porte. <br />a permit to construct a 10-Inch C02 Pipeline for Air Products <br />& Chemicals, Inc., I am hereby recommending full approval of <br />your project as submitted to the City of La Porte. <br />1. The Contractor must notify the City of La Porte Pub- <br />lic Works Department 24 hours prior to the crossing <br />of any city utility with the pipeline. <br />2. All crossings of streets, Street R.O.W., and improved <br />R.O.W. must be scheduled a minimum of 24 hours in ad- <br />vance with the City Public Works Department. <br />3. All street crossings shall be bored and cased and the <br />bore must be inspected and approved by the City Con- <br />struction Inspector. <br />• <br />4. Any damages to city facilities, utility pipelines, <br />streets. etc. shall be reported immediately and re- <br />paired at no cost to the City. Repairs must be in- <br />spected and approved by the City Construction Inspec- <br />tor, <br />S. The pipeline contractor must place a 24 hour phone • <br />number on file with both Public Works and the Inspec- <br />tion Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.